Retrievable Drilling Tools Overburden Eccentric Casing System

Shanghai Kangjiebao New Chemical Materials Co., Ltd. / 2022-07-04

Retrievable Drilling Tools Overburden Eccentric Casing System

  • Certification:ISO 9001:2000, SGS
  • Standard:GB
  • Surface Treatment:Spray-Paint
  • Manufacturing Process:Forging
  • Material:Carbon Steel
  • Transport Package:Wooden Case

=== Base Info ===

  • Model NO.:MK3E114,3"
  • Trademark:MING
  • Origin:China
  • HS Code:8207199000
  • Production Capacity:20000PCS,Year

=== Description ===

Technical Parameters

Model

Reaming Diameter(mm)

Casing Diameter(mm)

Equipped Hammer

MK3E108

118

93-99

90

MK3E127

136

115-117

110

MK3E146

152

130-134

110/340

MK3E168

185

148-156

110/340

MK3E178

195

158-166

150/340

MK3E183

196

168-176

350/360

MK3E193

206

176-182

360

MK3E219

236

199-207

360

 

How to order:

Casing Tube OD & ID + Reamer Bit Diameter + Minimal Casing Shoe ID + Hammer Shank Style


What we can do for you:
  1. High quality: We are the partners with a lot of big factories in China. We can provide the best quality products to you. 
  2. Competitive price: Competitive price because of direct factory price. 
  3. Fast delivery time:usually it takes 20 days for production.only 3 or 5 days if we have stock of your request size.
  4. Best quality control:We have our own experienced QC team,there will be strict inspection and testing for each order before shipping out.
  5. Problems solve ability:This ability comes from rich experiences of drill bits industry and reliable sales..
  6. OEM,ODM service:your own request about product will be served well.
  7. Best after service:We will go to your place to check and solve the problems if you need.

Advantages 
1.High quality steels materials. Steel is from TIMKEN and Tungsten carbide are YK05, or T6 from Element Six in Germany
2.Kingdrilling DTH tools are forged by advanced electron-hydraulic forging hammer.
3.Advanced heat-treatment equipment: multipurpose furnace heat treatment.
4.Completed moulding (tooling ) departments with many molds available.
5.Professional R&D team,completed quality system.
Strict Quality-Check Systems.

The information you may like to know before order:
1. Methods of Payment:
T/T (Telegraphic Transfer) or Western Union or L/C at sight
2. Handling time for an order
Based on order quantity, normally it takes 25 days for production.
Only 3 or 5 days if we have stock on your request size.
3. Shipping way
Sample order: We suggest Courier express like DHL/UPS/TNT/FEDEX or by air
Bulk order: We suggest by air or by sea.
4. Quality Control
We have our own experienced QC.
There will be strict inspection and testing for each order before shipping out.
5. After Services:
1. Our sales team will response for your question within 24 hours (Holidays Excluded)
2. Technical Support will be available in any time


FAQ:
1. How to order the products?
A: Please send the inquiry with detail item description or with Model number.
 
2. How about the common packing?
A: If there is no special packing demand, we will take it as our normal packing. First in small carton, and then put in the bigger carton together to make sure goods completed.
 
3. Can I expect a quality products?
A: Yes. mature production technology ensuring the quality satisfy international request.
 
4. How to check the product are the exact one you want?
A: If possible, please attach one reference picture to avoid any misunderstanding or any links from our website for a better understanding.
 
5. How to control quality?
A: We have our own experienced QC team,there will be strict inspection and testing for each order before shipping out.
 
6. Fast delivery time:
A: Usually it takes 25 days for production.only 3 or 5 days if we have stock of your request size.
 
7. Shipping way:
A: Sample order: we suggest Courier express delivery such as DHL/UPS/TNT/FEDEX or by air
Bulk order: by air or by sea we suggest.
 
8. Competitive price:
A:KINGDRILLING factory can supply you the lowest price due to direct sale to customers without distributor!

Product Application:

Retrievable Drilling Tools Overburden Eccentric Casing System

Transport:
Retrievable Drilling Tools Overburden Eccentric Casing System

Package and Delivery:
Packed by Carton or Wooden cases.

Delivery:
  1. Goods in stock can be delivered within 5 days.
  2. DTH Bits production time is about 15 days.
  3. DTH Hammer product time is about 30 days.
More products:
Retrievable Drilling Tools Overburden Eccentric Casing System





 

Copyright 2024 357th.com All Rights Reserved