- Certification:ISO 9001:2000, SGS
- Standard:GB
- Surface Treatment:Spray-Paint
- Manufacturing Process:Forging
- Material:Carbon Steel
- Transport Package:Wooden Case
=== Base Info ===
- Model NO.:MK5E183,5"
- Trademark:MING
- Origin:China
- HS Code:8207199000
- Production Capacity:20000PCS,Year
=== Description ===
Technical Parameters |
Model | Reaming Diameter(mm) | Casing Diameter(mm) | Equipped Hammer |
MK5E108 | 115 | 93-99 | 90 |
MK5E127 | 130 | 115-117 | 110 |
MK5E146 | 155 | 130-134 | 110/340 |
MK5E168 | 185 | 148-156 | 110/340 |
MK5E178 | 195 | 158-166 | 150/340 |
MK5E183 | 196 | 168-176 | 350/360 |
MK5E193 | 206 | 176-182 | 360 |
MK5E219 | 236 | 199-207 | 360 |
Order Guide:
Casing Tube OD & ID + Reamer Bit Diameter + Minimal Casing Shoe ID + Hammer Shank Style
Features:
1. Hardening treatment of the part's surface:with longer operating life and excellent anti-wear properties.
2. Structural optimization:Strengthen the structural strength, easy to operate.
3. Superior performance:Stable and reliable performance, high drilling speed.
What we can do for you:- High quality: We are the partners with a lot of big factories in China. We can provide the best quality products to you.
- Competitive price: Competitive price because of direct factory price.
- Fast delivery time:usually it takes 20 days for production.only 3 or 5 days if we have stock of your request size.
- Best quality control:We have our own experienced QC team,there will be strict inspection and testing for each order before shipping out.
- Problems solve ability:This ability comes from rich experiences of drill bits industry and reliable sales..
- OEM,ODM service:your own request about product will be served well.
- Best after service:We will go to your place to check and solve the problems if you need.
Advantages 1.High quality steels materials. Steel is from TIMKEN and Tungsten carbide are YK05, or T6 from Element Six in Germany
2.Kingdrilling DTH tools are forged by advanced electron-hydraulic forging hammer.
3.Advanced heat-treatment equipment: multipurpose furnace heat treatment.
4.Completed moulding (tooling ) departments with many molds available.
5.Professional R&D team,completed quality system.
Strict Quality-Check Systems.
The information you may like to know before order:
1. Methods of Payment:
T/T (Telegraphic Transfer) or Western Union or L/C at sight
2. Handling time for an order
Based on order quantity, normally it takes 25 days for production.
Only 3 or 5 days if we have stock on your request size.
3. Shipping way
Sample order: We suggest Courier express like DHL/UPS/TNT/FEDEX or by air
Bulk order: We suggest by air or by sea.
4. Quality Control
We have our own experienced QC.
There will be strict inspection and testing for each order before shipping out.
5. After Services:
1. Our sales team will response for your question within 24 hours (Holidays Excluded)
2. Technical Support will be available in any time
Product Application:Transport:Package and Delivery:
Packed by Carton or Wooden cases.
Delivery: - Goods in stock can be delivered within 5 days.
- DTH Bits production time is about 15 days.
- DTH Hammer product time is about 30 days.
More products: