High Efficiency Mpp Pipe Extrusion Line Machine Factory
Ningbo Conwhole Hardware Co., Ltd. / 2022-07-04
=== Base Info ===
=== Description ===
Basic Info.
Model NO.
SJ-75
Condition
New
Length(M)
30
Width(M)
2
Height(M)
3.5
Contactor
Siemens
Converter
ABB
Temperature Controller
Delta
Transport Package
Wooden Packing
Specification
20-63mm
Trademark
Trusty
Origin
Qingdao
Product Description
1.Company ProfileQingdao Trusty Plastic Machinery Company is located in Qingdao shandong peninsula, a beautiful coastal city, where railway, sea and aviation are very convenient.It is one of the coastal cities with rapid economic development.
Our company manages each kind of plastic machinery, has the rich mature technical experience. The quality of the equipment is reliable, and the price is reasonable.We are in unremitting efforts to work with you to create a brilliant tomorrow. 2.Production IntroductionMPP Cable Protection Pipe adopts modified polypropylene as the main raw material. MPP is a construction project for laying pipelines and cables in special areas such as roads, railways, buildings and riverbed, without a large amount of dredging, digging and damaging the road surface.This technique can also be laying pipelines in some areas can not be implemented excavation work, such as sites protected areas, downtown, crops and farmland protection areas, highways, rivers and so on.
Compared with the traditional "excavated buried pipe method", trenchless power to meet the environmental requirements of the current pipe engineering, remove caused by the traditional construction of the dust float in the sky, a nuisance factors such as traffic jam.3.Machine ListName | Quantity(set) |
Automatic drying feeder | 1 |
Single screw extruder | 1 |
Marker line extruder | 1 |
Extruding mould | 1 |
Shaper | 1 |
Vacuum tank | 1 |
Spray box | 1 |
Haul off with caterpillar | 1 |
Computer printer | 1 |
Chipless cutter | 1 |
Roll over table | 1 |
Crusher | 1 |
4.Technical ParameterModel | SJ-75 |
Total installation power(kw) | 130 |
Transformer (kw) | 100 |
Actual electricity consumption(kw) | 70 |
Capacity (kgh) | 400 |
Line speed (mmin) | 5-10 |
Pipe Diameter(mm) | 20-63 |
Motor Power(kw) | 55 |
5.Production ProcessFeed→Extrude→Shape→Spray→Haul off→Print→Cut→Stack the material→Crush6.After sales service(1)After the machines are finished, the seller will test all machines before shipment. If the buyer can not come to test the machine, we will test the machines and send the sample to buyer.
(2)After shipment, the seller will send one or two technicians to the buyer' s factory to help the buyer install the machine and train workers for buyer.
(3)We will supply all electricity drawing, machine installation drawing.
(4)When make shipment, we will put some spare electricity parts for free, like the barrel hearers, thermcouples, breakers, relays, and other items which is easier broken.