CHINA GTL TOOLS LIMITED / 2022-07-04
=== Base Info ===
=== Description ===
Host Model
Technology service | the supplier provide service manual and maintenance instruction of main electric appliance ,limb , usage manual of equipment We also supply water,electricity,gas of equipment and installation drawing. |
After-sale service | the supplier is responsible for installation,debug and training, we will realize guarantee of repair; replacement and refund of substandard products within one year after the machine leaves factory. Fittings of the machine will supply at preferential price after one year . |
INSTALL AND TRANING TIME | about two weeks for free ( when you prepare well water, power supply, etc. Needed condition), there will be 2 professional workers go to your factory for install and training. |
and the engineers' tickets ,eating ,transportation and visa fee will be bored by the buyer. | |
if buyer extends the time of installation and training ,buyer must pay our engineer 100USD salary/person/day |
New product
Hot product
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23