Galvanized Iron Packing Belt Tensile 16/19/25/32 mm Galvanized Steel Belt Hot DIP Steel Strapping

Lanxi Kingway International Trade Co., Ltd. / 2022-06-09

Galvanized Iron Packing Belt Tensile 16/19/25/32 mm Galvanized Steel Belt Hot DIP Steel Strapping

  • Application:Machine Packing
  • Certification:CE, ISO
  • Eco-Friendly:Eco-Friendly
  • Color:White
  • Material:Steel
  • Product Kind:Galvanized Steel Belt

=== Base Info ===

  • Transport Package:Waterproof Paper Inside, Then Plastic Film, Finall
  • Average Intensity:600MPa
  • Weight:40-50 (Kg)
  • Tensile Strength:More Than 600 MPa
  • Width:9.5-50 (mm)
  • Surface Finish:Painted & Waxed
  • Thickness:0.5 0.9 (mm)
  • Strap Material:Steel, High Tensile
  • Model NO.:DB-02-3
  • Specification:Waterproof paper inside, then plastic film, finall
  • Trademark:OEM
  • Origin:Zhejiang, China(Mainland)
  • Production Capacity:10000 Ton,Tons Per Year

=== Description ===
Overview Product Parameters

Galvanized Iron Packing Belt Tensile 16/19/25/32 mm Galvanized Steel Belt Hot DIP Steel StrappingGalvanized Iron Packing Belt Tensile 16/19/25/32 mm Galvanized Steel Belt Hot DIP Steel Strapping

OEM&ODM

Provide CUSTOMIZED SERVICES!!

Company Profile

Galvanized Iron Packing Belt Tensile 16/19/25/32 mm Galvanized Steel Belt Hot DIP Steel StrappingFactory Tour

Galvanized Iron Packing Belt Tensile 16/19/25/32 mm Galvanized Steel Belt Hot DIP Steel Strapping

 >Click Here To Contacts To GetFAQ

Q:When can I get the price?
We usually quote within 24 hours after we get your inquiry.

Q:How can I get a sample to check your quality?
After price confirmation, you can require for samples to check our quality.

Q:How long can I expect to get the sample?
It will be ready for delivery in 7-15 days. The samples will be sent to you via express and arrive in 3-5 days. You can use your own express account or prepay us if you do not have an account.

Q:What about the lead time for mass production?
Honestly, it depends on the order quantity and the season you place the order. The lead time of MOQ is about 15-30 days.

Q:What are your terms of delivery?
We accept TT FOB, CIF, etc. You can choose the one which is the most convenient or cost-effective for you. Payment≤1000USD, 100% in advance. Payment>=1000 USD, 30% T/T in advance, balance before shipment.

 

Copyright 2024 357th.com All Rights Reserved