China Wholesale MDF Top Living Room Nesting Coffee Table Side End Table with Metal Leg Modern Cafe Table

Jinjiang Chaote Co., Ltd. / 2022-06-27

China Wholesale MDF Top Living Room Nesting Coffee Table Side End Table with Metal Leg Modern Cafe Table

  • Style:Modern
  • Material:Metal
  • Folded:Unfolded
  • Customized:Customized
  • Condition:New
  • Model No.:Dt-022

=== Base Info ===

  • Model NO.:CT-022
  • Delivery Time:15-30days
  • OEM:Available
  • The Material:Metal
  • Sample:Available
  • Feature:Modern
  • After-Sales:Special Services
  • Usage Scenarios:Home
  • Warranty:1 Year
  • MOQ:200 Pieces
  • Payment Term:L,C T,T Western Union Paypal
  • Package:New Packing
  • Transport Package:Carton
  • Specification:Standard size
  • Trademark:Senpai
  • Origin:China
  • Production Capacity:500000,Year

=== Description ===
Overview

Certifications

China Wholesale MDF Top Living Room Nesting Coffee Table Side End Table with Metal Leg Modern Cafe Table

Company Profile

China Wholesale MDF Top Living Room Nesting Coffee Table Side End Table with Metal Leg Modern Cafe Table

Production process

 

Packaging & Shipping

China Wholesale MDF Top Living Room Nesting Coffee Table Side End Table with Metal Leg Modern Cafe Table

Our Advantages

 

China Wholesale MDF Top Living Room Nesting Coffee Table Side End Table with Metal Leg Modern Cafe Table
  1. More option

    China Wholesale MDF Top Living Room Nesting Coffee Table Side End Table with Metal Leg Modern Cafe Table

     

    FAQ

    1.How about your quality?
    We have QC department, they control every process,
    start from purchasing raw material to finish the goods and loading the container.

    2. What is your MOQ?
    Usually 200 pcs per model for chairs and 50 pcs per model for tables .

    3. Will you pack the goods with assembly instruction?
    Yes, we put the assembly instruction into the package.
    If you still don't know how to assemble, you may consult us.

    4. If we want a sample, how much do we need to pay?
    We usually charge 2 times price, and the transport fee should be paid by buyer,
    we will return the extra money when you place order.

    5. What about the leading time for mass production?
    It depends on the order quantity and the product.
    Usually our leading time is 20-30 days after order confirmed.

    If you have any interest, please feel free to contact us. Thank you.

Copyright 2024 357th.com All Rights Reserved