- Structure:Conveyor System
- Material:Stainless Steel
- Material Feature:Oil Resistant, Heat Resistant, Fire Resistant
- Application:Chemical Industry, Grain Transport, Mining Transport, Power Plant
- Condition:New
- Voltage:220,240,380,400,415,480V
=== Base Info ===
- Power:0.25~2.5kw
- Power Input:0.75kw
- Frequency:1450rpm
- Media Type:Weave Sieve,Perforated
- Dimension(L*W*H):1150*1000*1200
- Weight:320kg
- Capaticy:500kg~2t,H
- Transport Package:Wood Carton
- Specification:133*2000mm
- Trademark:Sanyuantang
- Origin:Xinxiang
- HS Code:8428399000
- Production Capacity:1000sets,Month
=== Description ===
model Model | screw diameter (mm) | Screw pitch (mm) | rotational speed of screw (r/min) | convey measure (m3/h) | motor power (kw) | max dip angle (o ) |
SY-100 | 100 | 100 | 140 125 112 100 90 80 71 63 50 40 | 2.2 | 2.2~18.5 | ≤20 |
SY-125 | 125 | 125 | 4.0 |
SY-160 | 160 | 160 | 8 |
SY-200 | 200 | 200 | 11 |
SY-250 | 250 | 250 | 22 |
SY-315 | 315 | 315 | 34 |
SY-400 | 400 | 355 | 64 |
SY-500 | 500 | 400 | 95 |
SY-630 | 630 | 450 | 150 |
SY-800 | 800 | 500 | 210 |
Screw conveyer operation and maintenance Spiral conveyer conveys powder, granules and small massive material as general application. All kinds' bearings work in dust, so screw conveyor reasonable operation and maintenance is very important in this working case. Screw conveyor operation and maintenance requirements as follows:
1. Spiral conveyor should start with non-loaded. It starts with no material in machine, then adding material.
2. Increase adding material speed gradually up to fixed conveying capacity and evenly adding material when adding material at first. Or else the material easy to blocking and actuating device overload leading to the whole machine damage.
3. In order to guarantee the machine starting with non-loaded requirement, the spiral conveyer should stop adding material before shut down.
4. The conveying material can't mix tough large material avoiding the machine stuck leading to damage.
5. Examine each part the screw conveyer working condition in use, notice the fastening parts loosen or not. If the parts loosen, we should tightening screw to make it fasten.
6. Pay special attention to the spiral tube and screw in connection shaft loosen or not. If it happens, we should stop and correct.
7. The cover can't take down in revolving in case leading to the accident.
8. The machine appears abnormality in revolving; we should examine and eliminate not forcing to revolve.