Long Neck End Mill

Zhejiang Shinevy Technology Co., Ltd. / 2022-06-09

Long Neck End Mill

  • Coating:Altin,Tialn,Tisin,Tin,Dlc,Nano,Diamond
  • Tooth Form:Spiral Tooth
  • Tooth Space:Extra Dense Tooth
  • Structure:Indexable Type
  • Material:Solid Tungsten Carbide
  • Type:Cylindrical Milling Cutter

=== Base Info ===

  • Free Service:OEM
  • Diameter:0.1mm-0.9mm
  • Length:50mm
  • HRC:45,55,60,65 HRC
  • Flute:2
  • Shank:Cylindrical Shank
  • Application:Stainless Steel Cast Iron Allumimum Copper
  • Manufacture:We Are Factory
  • Machine:Walter,Rollomatic, Ttb,Anca,Deckel,
  • Logo Print:Laser Marking for Free
  • Transport Package:1PC in a Plastic Tube, 10PCS a Group
  • Specification:customized
  • Trademark:LeeHoo
  • Origin:China
  • HS Code:820770000
  • Production Capacity:100000

=== Description ===

Basic Info.

Free Service OEM Diameter 0.1mm-0.9mm Length 50mm HRC 45/55/60/65 HRC Flute 2 Shank Cylindrical Shank Application Stainless Steel Cast Iron Allumimum Copper Manufacture We Are Factory Machine Walter/Rollomatic/ Ttb/Anca/Deckel/ Logo Print Laser Marking for Free Transport Package 1PC in a Plastic Tube, 10PCS a Group Specification customized Trademark LeeHoo Origin China HS Code 820770000 Production Capacity 100000

Product Description

Long Neck End Mill
DESCRIPTION
HRC:45/55/58/60/65/70
Coated:Altin/Tialn/Tisin/Tin/DLC/Nano/Diamond

1. Can be used for the processing of copper, cast iron, carbon steel, mold steel, stainless steel, titanium alloy, tool steel, and heat-treated steel
2. Bring good surface roughness after processing
3. With highly heat-resistant coating, can be used for high-speed processing
4. High toughness, using grain-sized carbon tungsten as the raw material
5. Help to increase the smoothness, reduce the friction coefficient,and improve the lathe efficiency, thus save more production time
6: Walter/Rollomatic/ Ttb/Anca/Deckel machinery in our factory


SPECIFICATION
 
HRC55 Micro diameter flat end millHRC60 Micro diameter flat end millHRC60 Micro diameter ball nose end mill
D0.3*D4*50*2FD0.2*D4*50*2FR0.1*D4*50*2F
D0.4*D4*50*2FD0.3*D4*50*2FR0.15*D4*50*2F
D0.5*D4*50*2FD0.4*D4*50*2FR0.2*D4*50*2F
D0.6*D4*50*2FD0.5*D4*50*2FR0.25*D4*50*2F
D0.7*D4*50*2FD0.6*D4*50*2FR0.3*D4*50*2F
D0.8*D4*50*2FD0.7*D4*50*2FR0.35*D4*50*2F
D0.9*D4*50*2FD0.8*D4*50*2FR0.4*D4*50*2F
 D0.9*D4*50*2FR0.45*D4*50*2F
Long Neck End Mill
Long Neck End MillChangzhou Lihao Tools Co., Ltd. is which was founded in 2012, is located in Changzhou, Jiangsu, China. Our company is one of the most professional manufacturers in the whole carbide cutting tool industry in China. After more than ten years of developmentOur company has more than 40 sets of machines include Walter and Rollomatic brand, We already occupy a large market share in China. At the same time, it is widely recognized by more and more abroad customers

The purpose of the company is to provide customers with the most cost-effective products and provide quality services. Meanwhile, in order to meet the needs of different customers, the company′s professional technicians will provide customized services for professional customers.


Long Neck End Mill
Long Neck End MillLong Neck End MillLong Neck End Mill

1) When can I get the price?
We usually quote within 24 hours after we get your inquiry. If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority.

 

2) How can I get a sample to check your quality?

After price confirmation, you can require for samples to check our quality.

3) How long can I expect to get the sample?

After you pay the sample charge and send us confirmed files, the samples will be ready for delivery in 3-7 days. The samples will be sent to you via express and arrive in 3-5 workdays. You can use your own express account or prepay us if you do not have an account.

 

4) How long does the whole procedure being worked out?

After you place an order, the production handling time is about 20 days. We need 5 days to prepare all the stuff then 15 days for manufacturing.

 

5) What about the transportation and delivery date?

Normally we use shipment to transport the goods. It is about 25-40 days. It also depends on which country and port you are in.It could be shorter if you need to send the goods like Asian. If there are some emergencies we can send the goods via air express, as long as you afford the traffic expense.

 

6) Are you a trading company or manufacturer?

We are a professional manufacturer. 

 

7) Where is your factory located?

We are located in  Xixiashu Town, New North District, Changzhou City, Jiangsu, China.

 

 

8) How about your stock?

We have large quantity products in stock, regular types and sizes are all in stock.

 

9) Is free shipping possible?

We don't offer a free shipping service. We can have a discount if you buy a large quantity of products.

Copyright 2024 357th.com All Rights Reserved