Steel Roller Machining Chrome-Plated Steel Roller
DEMEI Industrial Limited / 2022-06-27
- Material:Carbon Steel
- Surface Treatment:Baking Paint
- Motor Type:Frequency Control Motor
- Installation:Horizontal
- Roller:5
- Transport Package:Soft Film and Wood Box
=== Base Info ===
- Specification:diameter 75--150mm
- Trademark:CRW
- Origin:Qingdao China
- HS Code:73089000
- Production Capacity:50000PCS Per Year
=== Description ===
Basic Info.
Specification
diameter 75--150mm
Trademark
CRW
Origin
Qingdao China
HS Code
73089000
Production Capacity
50000PCS Per Year
Product Description
Product Name | Automated Roller Conveyor |
Material | Stainless/Steel/Carbon Steel/Galvanized Steel |
Pitch | As your application |
Certification | ISO&CE&SGS |
Processing | Injection molding and machining |
Structure | Height/Speed adjustable |
Color | As requirement |
Application | Food & beverage &Packing industry & Pharmacetic etc |
Processing, manufacturing, sales: mechanical equipment and parts
(excluding special equipment), mechanical and electrical equipment,
steel and plastic products, hardware products, welding sheet metal
products, labor protection supplies, civilian masks; Ordinary freight
(to carry out business activities according to the license issued by
the competent authority); Import and export of goods and
technologies (except for those prohibited by laws and administrative
regulations; The project restricted by laws and administrative
regulations can be operated only after obtaining the license.
(For projects subject to approval according to law, business activities
can only be carried out after approval by relevant departments)1. Are you manufacture factory or trading company?
We are manufacture factory. And you are welcomed to visit us at any time. The quality control flow and sales team will show you our professionalism. Also, you will get best and most competitive price after visiting us.
2. Is your price competitive compared to other companies?
Our business objectives are to give the best price with same quality and best quality with the same price. We will do everything we can to reduce your cost and guarantee you get the best product that you paid for.
3. Do you accept container loading inspection?
You are welcomed to send an inspector, not only for the container loading but anytime during the production time.
4. Do you offer OEM service for us?
Yes, we could design full solution drawings as your requirements.
5. What is the delivery time?
Delivery time depends on order quantities. In general, the delivery time to the nearest seaport in China will be 30 days after receiving the deposit.