Magnetic Clutch for Bock Compressor

Extra Link Printing&Packaging Co, Ltd / 2022-06-24

Magnetic Clutch for Bock Compressor

  • Classification:Electromagnetic Clutch
  • Certification:ISO,TS16949:2002
  • Usage:Bus
  • Working Mode:Electricity Combination
  • Voltage:24V,12V
  • Electromagnetic Clutch:Magnetic Powder Clutch

=== Base Info ===

  • Model NO.:LN2126
  • Transport Package:Carton Box
  • Trademark:KINGBO
  • Origin:China

=== Description ===

Basic Info.

Model NO. LN2126 Transport Package Carton Box Trademark KINGBO Origin China

Product Description

Product feature

The shot mode of the strap wheel: 2A2B
Rated voltage: 24V
Minimal inhale close voltage: 16V
Consumed power: 60W
Static friction torque: 280N.m
Operating revolution range: 500 to 3,500rpm
Applicable compressor Bock and bitzer


Guangzhou Jingyi auto air conditioner introduction
Magnetic Clutch for Bock Compressor



Jingyi Group's Vehicle Air Conditioner manufacturing equiment capacity: 6 production lines for bus and
midibus air-conditioner unite (Annual production capacity of 50000 sets).
9 production lines for all kinds of product quanlity test, with more than 130sets equipments.
Entrtprise hardware facilities manufacturing equipment level in industry-leading position,
is domestic bus air-conditioning R&D and manufacturing base.
Magnetic Clutch for Bock Compressor

production lineMagnetic Clutch for Bock Compressor
Magnetic Clutch for Bock Compressor
Magnetic Clutch for Bock Compressor

Question& Answer


Q. 1: Are you manufactory or trade Company? 
We are the Manufactory specialized in air conditioning industry products for 31 years already. We have 4 bus air conditioning factories in Guangzhou, Guangdong province, China. Our factory have passed IS09001:2000, CCAP and ISO/TS 16949: 2000.
Also we had latest Technical Center and quality control testing department for purchasing products for clients.

Q. 2:  How to control quality? 
A, all the raw materials by IQC (Incoming Quality Control) before launch whole process into the process after the screening.
B, process each link in the process of IPQC (Input process quality control) patrol inspection.
C, after finished by QC full inspection before packing into the next process packaging.
D, OQC before shipment for each product to do full inspection.

Q. 3: How long can I expect to get the products? 
The delivery time is within 15-20 days once receipt of the deposit.
 
Q. 4: How to order? 
 
We need to know the following information for your order before sending you PI.
1) Product information-Quantity, Specification (Your size of buses, model of current use of buses (if have), city bus or coach, compressor bracket assembly and alternator needs)
2) Delivery time required.
3) Shipping information-Company name, Street address, Phone & Fax number, Destination sea port.
4) Forwarder's contact details if there's any in China.

Copyright 2024 357th.com All Rights Reserved