Shenzhen Jiarun Precision Science & Technology Co., Ltd. / 2022-06-23
=== Base Info ===
=== Description ===
The goods elevator can be customized as your detailed size.
Configuration:
1) Platform Material: rectangular tube + checkered anti-slip plate
2) Support scissors: high strength Manganese Steel.
3) Hydraulic system: 380V/3.0Kw or 220v or as your request
4) Hydraulic cylinder: high precision wear-resisting cylinders with locking device for fall protection
5) Piston Rod: hard chromium plating surface.
6) High-pressure oil pump: from Italy or Chinese famous brand.
7) Hydraulic pipe: high pressure pipe with double expanded metal protected
8) Hydraulic oil: summer 46#, winter 32#
9) Controller: 1 control box below, 1 hand controller above platform
Safety:
1) Explosion-proof lock valve to avoid a sudden drop if emergency occurs.
2) The safety rails to guarantee safety of the goods above Electric Hydraulic lift platform .
3) Equipped 4 guide rails, to ensure the goods elevator runs more smoothly and steadily.
4) The limit switch system helps the goods elevator to stop at accurate position.
5) Electricity leakage protection device is equipped on, all electric components are CE certified.
6) All the goods elevator are passed 1.2 times loading test before leaving factory.
Our services:
1) We can design the goods elevator as per your requirement.
2) The most suitable goods elevator will be recommended to you once we get your requirement.
3) Shipment can be arranged from our port to your destination port.
4) Operation video can be sent to you if needed.
5) User-friendly English manual for machine installation using and maintenance.
6) 2 years warranty for whole machine without man-made faults.
7) We will send you parts for free if there are any non-human factors faults during warranty time.
8) Supply 24-hours technical assistance by email, telephone or other communication online.
9) Engineers are available to your country if necessary.
New product
Hot product
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23