Jiangyin Yiran International Trading Co., Ltd. / 2022-06-27
=== Base Info ===
=== Description ===
1. The appearance of idlers should be carefully checked for serious knock and damage before use. The rotating idlers should be flexible and free from jam.
2. The installation distance of idlers shall be determined by scientific calculation according to the type of logistics and the transport capacity of the conveyor, so as to avoid too sparse or too dense installation.
3. Idlers shall be installed to avoid grinding and collision with each other.
Power Plant-Pump&Spare part |
Circulating water pump |
Closed cooling water pump |
Electric feed water pump |
Condensate pump |
Stator cooling water pump |
Water ring vacuum pump |
Main oil pump |
Lub. oil pump |
Raising pump/Boosting pump |
Feedwater booster pump |
Boiler feed pump |
Ash pump |
Partners |
Harbin Turbine (HTC) |
Dong Fang Turbine (DTC) |
Nanjing Turbine (NTC) |
Shanghai Turbine (STP) |
Qingdao Jieneng Steam Turbine (JieNeng) |
Hangzhou Turbine (HTC) |
Chang Jiang Energy Corporation (CCJEC) |
Hangzhou Chinen Steam Turbine (HCTC) |
Shandong QingNeng Power (QingNeng) |
Beijing Beizhong Steam Turbine (BEIZHONG) |
Changsha Pump |
Shenyang Pump |
Shanghai Pump (SPMC) |
SULZER Pump |
EBARA Pump |
New product
Hot product
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23