Qingdao Huarida International Trading Co., Ltd. / 2022-06-24
=== Base Info ===
=== Description ===
Process
1.How can I get quotation and feedback for my products?
Provide your 2D drawings with specifications (material, surface treatment, tolerance, other requirement, etc.); Please inform your quantity usage (MOQ and annual need) and logistic requirement; 3D drawings are much welcome for full product review.
2.How long can I get the quaotation?
Normally, we can provide instant feedback and then provide quotation within 48 hours
3.How long will you produce the parts?
Production lead time for CNC machining is 1-4wks, according to difference products and quantity. We will communicate with Customers on production plan and delievery for each PO.
If a mold is needed, the mold making time will be:
1) 2-3wks for extrusion molds
2) 4-8wks for die casting molds or plastics injection molds
3) 2-3wks for stamping molds
4.What's your payment terms
1) Especailly for new customers: T/T in advance or 50% T/T in advance, left needs to be wired before delivery.
2) L/C
5.Incoterms:
1) Ex-works or FOB Shanghai, is preferied;
2) CIF
3) DDP: need further communication on cost & logistics issues with Customers
6.Shipment: By Air or Ocean
Normally by air for samples (if not too heavy)
7.Will you sign NDA?
Yes, NDA is necessary between us.
8. Refund Terms:
We support refund policy for bad products, but customers must return back the bad products and in charge of the shipping cost.
New product
Hot product
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23