High Quality M51 M42 Metal Cutting Bi-metal Band Saw Blade

Zhejiang Alwsci Technologies Co., Ltd. / 2022-06-09

High Quality M51 M42 Metal Cutting Bi-metal Band Saw Blade

  • Certification:ISO9001:2008, ISO9001:2000, RoHS, CE, SGS
  • Tooth Form:Curved Back Tooth
  • Diameter:3035, 3300, 3430, 3505
  • Function:Cutting
  • Shape:Band Saw Blade
  • Coating:Uncoated

=== Base Info ===

  • Model NO.:34*1.1 27*0.9 41.1.3 54.1.6
  • Type:Horizontal or Vertical Band Saw Machine Blade
  • Hardness:HRC67-69
  • Material:M42 Bi-Metal
  • Style:Band Saw Machine Blade
  • Delivery Time:4-8 Weeks After Order
  • Application:Carbon Steel and Alloy Steel Cutting.
  • Transport Package:100meters by a Case, 2000meters by a Pallet
  • Specification:27x0.9mm M42
  • Trademark:FUWEISI, BOSS CUT
  • Origin:Germany, Japan, USA Material.
  • HS Code:820201000
  • Production Capacity:5 Million Meters Per Month

=== Description ===
                       TPI19x0.9mm 3/44/65/86/108/1210/1427x0.9mm2/33/44/65/86/108/1210/1434x1.1mm2/33/44/65/8   41x1.3mm2/33/44/6    
Special size and TPI can also be produced upon request.

Why choose FUWEISI Saw Industry?

  • 20 Years experience in bi-metal saw blade manufacturing.
  • Certified band saw blade material from overseas.
  • Professional sales & technical team at your service.
  • FUWEISI Saw Industry is specialized in providing whole metal cutting blades and solutions  for customers.
  • Factory with the best competitive price and quality .
  • Directly after-sales service from Factroy
  • Owned different certificates such as CE, TUV,SGS, ISO9001, etc.
  • Owned direct export license,and have been exporting to more than 20 countries and regions.
Do you accept OEM orders?
  • Yes, we can make OEM for saw blades according to your requests,but we have minimum order qty to start.
What is your warranty?
  • Quality: 100% assured by strict QC system,and manufactured according to export standard.  
What is the payment term if I placed orders to you?
  • Normally we will accept T/T or L/C. More details can be discussed case by case.
What is your lead time?
  • 4- 8 weeks after receiving advance payment. Special situation can be discussed case by case

Copyright 2024 357th.com All Rights Reserved