=== Base Info ===
=== Description ===
LDPE LLDPE LDPE |
Width of Film | 600 | 800 | 1000 | 1200 | 1500 |
Thickness of Film | 0.008-0.10 | 0.008-0.10 | 0.01-0.10 | 0.01-0.10 | 0.01-0.10 |
Max. Extrusion Output | HDPE:60kg/h | HDPE:75kg/h | HDPE:80kg/h | HDPE:90kg/h | HDPE:110kg/h |
LDPE:70kg/h | LDPE:85kg/h | LDPE:90kg/h | LDPE:100kg/h | LDPE:120kg/h |
Extruder |
Screw Diameter | Φ45x2 | Φ50x2 | Φ50x2 | Φ55x2 | Φ60x2 |
Screw L/D Ratio | 30:1 |
Screw Material | SAC-645/38CRMOALA |
Feeding Tube Material | SAC-645/38CRMOALA |
Feeding Tube Cooling | 180Wx3 | 180Wx3 | 180Wx3 | 180Wx3 | 180Wx4 |
Main Motor Power | 11kWx2 | 15kWx2 | 15kWx2 | 18.5kWx2 | 22kWx2 |
Temperature Control Point | 3 | 3 | 3 | 3 | 4 |
Screen Changer |
For network type | Manual Change |
Temperature Control Point | 1 | 1 | 1 | 1 | 1 |
Die Head |
Die Diameter | HDPE:Φ55mm | HDPE:Φ80mm | HDPE:Φ110mm | HDPE:Φ130mm | HDPE:Φ150mm |
LDPE:Φ160mm | LDPE:Φ180mm | LDPE:Φ220mm | LDPE:Φ250mm | LDPE:Φ300mm |
Cooling Air Ring Type | Double Air Duct |
Blower Power | 3kW | 4kW | 4kW | 5.5kW | 7.5kW |
Extraction device |
Pull The Toll width | 700 | 900 | 1100 | 1300 | 1600 |
The Speed of Extraction | 10-80 |
Trigger Motor Power | 1.5kW | 2.2kW | 2.2kW | 3kW | 3kW |
Stability Ring | 1 |
Winding Device |
Coiling Type | Back To Back |
Effective Width | 600 | 800 | 1000 | 1200 | 1500 |
Maximum Winding iameter | 800 |
Take The Roll | Φ250x700L | Φ250x900L | Φ250x1100L | Φ250x1300L | Φ250x1600L |
Air Up The Scroll | 2 sets |
Land size (m) | 5x3.5x5 | 5.5x3.7x5 | 6x3.9x5.2 | 6.5x4.1x5.2 | 7x4.2x6 |
Optional device | Corona processor, hydraulic fast screen changer, back to back automatic coiler, rotary head |
1. Q: Are you a factory or trading company?
A: We are both a factory and trading factory.
2. Q: What certificate do you have?
A: We have ISO9001, SGS.
3. Q: How dose your factory do regarding quality control?
A: We have a special QC department in charge of product's quality.
4. Q: How long is the warranty period?
A: All of our products have one year warranty.
5. Q: What's the main market of your company?
A: we have customers all over the world.
6. Q: What is your delivery time?
A: Normally, It needs about 30 working days. The exact time depends on production management.
7. Q: Can we visit your machine operation in your factory?
A: We have own plastic making company, you can see the machine operation.
8. Q:What`s the payment method?
A:We can accepted T/T,L/C,Western Union,Moneygram ETC.