Water-Cooling Plastic Granulating Machine Slz-120 Plastic Recycling Machine

BEHAPPY CRAFTS (SUZHOU) CO., LTD. / 2022-07-04

Water-Cooling Plastic Granulating Machine Slz-120 Plastic Recycling Machine

=== Base Info ===

=== Description ===

Basic Info.

Model NO. SLZ-120 Computerized Non-Computerized Certification ISO9001:2008, CE Certificate CE,ISO9001 High Output 88kg/H Guarantee One Year Transport Package Stretch Film or Wooden Case Specification CE, ISO9001 Trademark HOIN Origin Ruian, Zhejiang, China HS Code 84772010 Production Capacity 30 Set/Month

Product Description

Machine Feature:

1) The hard machine faces the appropriation deceleration box;

2)The 38 CrMOLA downplays to anticipate the tube pole; Line up the spirit adoption takes out the 

vacuum method, guarantee

that the few son has no spirit Bore;

3)Don't shut down to change the net machine; Cool off the sink;

4) Blow the dry breeze machine;

5)Roll the knife type slices a machine.

6)It is suitable for PP,HDPE, LDPE, LLDPE, MDPE, , etc material recycle and granulate.

Main Technical Parameter:
MODLESLZ-120
Screw dia(mm)Φ120
Screw L/D22:1
Screw rotation10-100r/min
Main motor(kw)45
Max.extrusion output120kg/h
Weight (kg)2500
Dimension LxWxH(mm)8800x1600x1800
Machine Pictures for Reference:
Water-Cooling Plastic Granulating Machine Slz-120 Plastic Recycling MachineWater-Cooling Plastic Granulating Machine Slz-120 Plastic Recycling MachineWater-Cooling Plastic Granulating Machine Slz-120 Plastic Recycling MachineWater-Cooling Plastic Granulating Machine Slz-120 Plastic Recycling Machine
Water-Cooling Plastic Granulating Machine Slz-120 Plastic Recycling MachineWorkshop of HOIN
High Speed PE Film Blowing Machine for HDPE LDPE LLDPEHigh Speed PE Film Blowing Machine for HDPE LDPE LLDPEHigh Speed PE Film Blowing Machine for HDPE LDPE LLDPE
More Products Optional
High Speed PE Film Blowing Machine for HDPE LDPE LLDPEAfter Service of HOIN
1. How long will your engineer reach to our factory?
Within one week after machine arrival at your factory.
2. How many days will you finish installing?
We will finish installation and training within 15days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's visa, air tickets, hotel, food, and also their salary 100USDper day per person.
4. How long of your machine's warranty period?
Our machines have one year guarantee after finishing installation under normal operation.
5. How could we do after one year warranty period?
We will still offer you our best after service, of course you will afford our technician's cost.
6. How could we do if the parts broken within of after warranty?
We will express the free replacement parts during the warranty date and also send you parts needed by value after warranty.
7. Does your engineer understand English?
Our engineers understand a little English. All of our engineers have rich experience for installingmachines over seven years. In addition, they also can communicate with you using their body language vividly.
8. Can you find us any engineer in our location?
Of course, we will check and inform you as soon as possible.

Copyright 2024 357th.com All Rights Reserved