Trusty 2021 New Type PPR Pipe Extrusion Line/Trusty 2021 New Type Pert Pipe Extrusion Line

Ningbo Conwhole Hardware Co., Ltd. / 2022-07-04

Trusty 2021 New Type PPR Pipe Extrusion Line/Trusty 2021 New Type Pert Pipe Extrusion Line

=== Base Info ===

=== Description ===
Trusty 2021 New Type PPR Pipe Extrusion Line/Trusty 2021 New Type Pert Pipe Extrusion LineTrusty 2021 New Type PPR Pipe Extrusion Line/Trusty 2021 New Type Pert Pipe Extrusion Line Trusty 2021 New Type PPR Pipe Extrusion Line/Trusty 2021 New Type Pert Pipe Extrusion LineTrusty 2021 New Type PPR Pipe Extrusion Line/Trusty 2021 New Type Pert Pipe Extrusion LineTrusty 2021 New Type PPR Pipe Extrusion Line/Trusty 2021 New Type Pert Pipe Extrusion Line

2.Production Introduction
This production line is mainly used for the production of pipe material with PP-R resin as raw material, but also suitable for the production of pipe material with PE-RT, Pb, PE-X resin as raw material.
 feature:
This production line is mainly used for the production of pipes with PP-R resin as raw material, and it is also suitable for the production of pipes with PE-RT, PB, and PE-X resin as raw materials.
1. Man-machine interface operation, high degree of automation.
2. It adopts special screw and has good plasticizing effect.
3. The composite spiral head is used to effectively clear the material memory.
4. Vacuum shaping and constant temperature control eliminate pipe stress.
5. The co-extrusion machine head is adopted, and the pipe color line is added.
6. Large extrusion volume, low melt temperature and uniform melt temperature.
7. A wide range of material processing.
Trusty 2021 New Type PPR Pipe Extrusion Line/Trusty 2021 New Type Pert Pipe Extrusion Line
Application:
1. Man-machine interface operation, high degree of automation.
2. Using special screw, plasticizing effect is good.
3. Adopt compound spiral head, effectively remove material memory function.
4. Vacuum shaping and constant temperature control eliminate the stress of pipe material.
5. Adopt co-extrusion machine head and increase the standard color line of pipe material.
6.Large extrusion capacity, low melt temperature, melt temperature uniform.
7.A wide range of material processing.
Trusty 2021 New Type PPR Pipe Extrusion Line/Trusty 2021 New Type Pert Pipe Extrusion LineTrusty 2021 New Type PPR Pipe Extrusion Line/Trusty 2021 New Type Pert Pipe Extrusion Line
3.Technical Parameter

ModelExtruderDiameter(mm)Motor Power(kw)Capacity(kg/h)L/D(L/D)
SJ-63SJ6520-634580-15033:1
SJ-110SJ7563-11055150-20033:1

4.After Sale Servece
(1)After the machines are finished, the seller will test all machines before shipment. If the buyer can not come to test the machine, we will test the machines and send the sample to buyer.
(2)After shipment, the seller will send one or two technicians to the buyer' s factory to help the buyer install the machine and train workers for buyer.
(3)We will supply all electricity drawing, machine installation drawing.

(4)When make shipment, we will put some spare electricity parts for free, like the barrel hearers, thermcouples, breakers, relays, and other items which is easier broken.

Trusty 2021 New Type PPR Pipe Extrusion Line/Trusty 2021 New Type Pert Pipe Extrusion Line
5.FAQ
1.WHY CHOOSE US
We are the Professional manufacturer to develop the plastic extrusion machines in Qingdao. Machine quality and customer satisfaction is our pursuit.Be sure we have the strength to provide you with quality machines and perfect service.
2.WHAT SERVICES DO WE OFFER?
Pre-sale communication Design proposal, signature confirmation
Customized production Test machine before shipment Package &
delivery Engineer installationTraining operator Technical sup
port
3.PAYMENT TERMS:
30% of total amount should be paid by T/T as down payment ,the balance (70% of total amount) should be paid before delivery by T/T or irrevocable L/C by payment(at sight).
4.DELIVERY CONDITIONS:
4.1 Delivery condition: FOB Qingdao port or CIF destination Port.
4.2 Delivery terms: Within 30-60 working days after receipt of advanced payment, the seller should inform the buyer to do inspection,the seller should finish packing of goods and ready for shipment within 15 working days after the seller receipt the full payment.

5.WARRANTY TERMS
5.1 Warranty period: 12 months, starting from the machine receipt in customer's warehouse
5.2 Seller shall grant: services and spare parts, free-of-charge service throughout the entire equipment during warranty period.
5.3 long life service: the seller should provide long life service for the sold goods, the buyer pay for needed spare parts after the 12months warranty terms.

6.INSPECTION
When the machine finished, the seller should inform the buyer to do inspection before shipment, the seller guaranty good performance of all the sold goods.the seller undertake the material cost for the machine inspection in seller's factory. the buyer should come to seller's factory to do the inspection work, or the buyer could entrust any third party to come to seller's factory to do the inspection work.
7.INSTALLATION AND EQUIPMENT COMMISSIONING:
if the buyer requires, the seller should send technician team to buyer's factory for installation and testing the whole line, and the buyer should undertake the whole food/place and round tickets (airplane, food, hotel, and so on), and pay salary to engineer for 100 usd/day/engineer.

Copyright 2024 357th.com All Rights Reserved