=== Base Info ===
=== Description ===
Weight | 26 KG |
All length | 660MM |
Air consumption | ≤82L/S |
Drilling Frequency | ≥40HZ |
Air pipe inner Dia. | 25MM |
Water pipe inner Dia. | 13MM |
Drilling Hole Dia. | 34-42MM |
Drilling Depth | 5M |
Shank Size | 22*108mm |
Air pressure | 0.63Mpa |
FT160 Air leg: | |
Weight | 17KG |
Length | 1800MM |
Pushing stroke | 1370MM |
FY250 Oil Reservior: | |
Weight | 1.2KG |
Oil capacity | 250ML |
YT29 Air-leg Rock Drill most fit for drilling horizontal and inclined blast holes in medium-hard and hard rock with a hardness of f=8~18.
It may also be used with for making roof-bolting holes. The drill is an important instrument in mining, railway, communication and water conservancy projects.
May be used together with FT160BC or FT160BD Air-leg and FY200B Line Oiler with transparent casing. The tool can also be mounted on a rig or a wagon.
Air leg
Air-leg Specifications:
Model | FT160BC | FT160BD |
Length | 1800 mm | 1400 mm |
Feed Length | 1365 mm | 965 mm |
Weight | 16.9 kg | 14.4 kg |
FY200B Line Oiler Specifications:
Capacity | 200 ml |
Weight | 1.02 kg |
Features:
- Grouped control mechanism, quick of start up, with "air-on, water-on, air-off, water-off" mechanism, easy operation and maintenance.
- Low noise, small vibration, energy-saving and efficient, highly interchangeable parts with long service life, reliable performance.
- Different from similar products particularly in its high efficiency, strong flushing and powerful torque.
Application:
YT29 air pusher leg rock drill working in tunneling
YT29 carton package
Operation & Maintenance:
Besides observance of the general safety precautions for rock drilling operations, particular attention should be paid to the following:
- The rifle nut and the piston are matched with left-hand threads. Cautions should be taken during assembling and disassembling.
- Before connecting the drill to the air and water supplies, check carefully if the wire clips (37)(43) are entirely and correctly set in the respective semi-circular grooves of the backhead (29). Check frequently the wear on the clips and timely replace the worn-out or broken one or broken one to avoid the shooting out of the swivel or the connector when the air or water is on.
- Before operation, fill the line oiler with lubrication oil to the required level. The drill should not be run without proper lubrication (recommended lube oil N46 and N22, Chinese National Standard GB443-84).
- After operation, first turn off the water, lightly run the drill for a few seconds, blow out the residual water drops to prevent the parts from being corroded.
- If the drill is often used, should maintenance it regularly to ensure the inside parts cleaning. Especially pay attention to change the worn parts and lose efficient parts.
Terms & Conditions of Ordering:
1 .Payment Terms:
T/T (Telegraphic Transfer) or Western Union
2. Delivery Term:
Based on order quantity, normally it takes 25 days for production.
Only 2 or 3 days if we have stock on your request size.
3. Transportation:
Sample order: we suggest Courier express or by air
Bulk order: we suggest by air or by sea.
4. Quality & Service:
A. There will be strict inspection and testing for every order before shipping out.
B Our sales team and Technical Support will response for your question within 24 hours (Holidays Excluded)
C. Free replacement will provide once the failure confirmed caused or our product quality; Not satisfied with a refund.