GD 220T Horizontal Directional Drilling Machine pipe laying machine

Zhejiang Weigang Technology Co., Ltd. / 2022-06-23

GD 220T Horizontal Directional Drilling Machine pipe laying machine

=== Base Info ===

=== Description ===
Rig Weight29000 kgDimension(L*W*H)11000*2450*3100(mm)Max. Push&Pull Force2200 kNMax. Torque83000 N·mMax. Push&Pull Speed41 m/minMax. Rotation Speed90 r/minEngine Power2*239/2*242 kWMax. Mud Pump FlowOptional Extra Mud PumpCaterpillar Walking Speed3-6(km/h)Max. Mud Pump PressureOptional Extra Mud PumpEntry Drill Angle10°-22°Max. Climbing Gradient20°Max. Aperture Diameterø1500mm(Soil Depended)Max. Crossing length1500m(Soil Depended)GD 220T Horizontal Directional Drilling Machine pipe laying machine

1.Cummins Turbocharged Engine: strong power, stable performance and low consumption.

2.French Poclain high pressure piston motor for rotation; German rexroth for thrust and pullback.

3.Low clamping center can protect the drill rod effectively, and takes up small construction space.

4.Front and back clamps can be separated, and the clamping can change block according to drill rod specification.

5.The floating spindle is in favor of protecting drill pipe thread.

6.Four bar linkage luffing structure increases entry angle range.

7.Proportional wire control walking system ensures the safety of people.

8.Rotary Manipulator makes the drill rods slip automatically.

9.The operating room with warm/cool AC, can be lifted up and down.

10.Two operation systems, automatic operation system and manual operation system.

11.With double power system, you can choose single engine or dual engine to work according to the project requirement, saving oil charge.
GD 220T Horizontal Directional Drilling Machine pipe laying machineGD 220T Horizontal Directional Drilling Machine pipe laying machineGD 220T Horizontal Directional Drilling Machine pipe laying machineGD 220T Horizontal Directional Drilling Machine pipe laying machine

1. What about the warranty time?

    A:12 months after shipment or 2000 working hours, whichever occurs first.

2. What about the delivery time?

    A:20 days after receiving the deposit.

3.What kind terms of payment can be accepted?

    A: On T/T term, 30% down payment is required in advance, and 70% balance shall be before shipment, or against the copy of original BL for old client.

       On L/C term, 100% irrevocable L/C without "soft clause" can be accepted. 

4.What logistics ways we can work for shipment?

    A: We can ship machine by sea and road. 

 5. What about the after-sales service?

   A: We have office and professional after-sales service team in many countries. After you receive the new machine, we will provide you one engineering training installation and debugging service for 3-5days. If there are some problems, our after-sales service team will arrive the project site in shortest time.

Copyright 2024 357th.com All Rights Reserved