- Warranty:1
- Condition:New
- Customized:Customized
- Voltage:380V
- Composition:Filling Machine
- Processing Material:Garden Products
=== Base Info ===
- Model NO.:by order
- Process:Frozen and Chilled
- Certificate:Ce SGS ISO9001
- Transport Package:Export Standard Packages
- Specification:ISO9001
- Trademark:Beyond
- Origin:China, Zhangjiagang
- HS Code:8422309010
- Production Capacity:100PCS,Year
=== Description ===
Basic Info.
Model NO.
by order
Process
Frozen and Chilled
Certificate
Ce SGS ISO9001
Transport Package
Export Standard Packages
Specification
ISO9001
Trademark
Beyond
Origin
China, Zhangjiagang
HS Code
8422309010
Production Capacity
100PCS/Year
Product Description
Full Automatic Glass Bottle Beer Filling Machine
Descriptions:Based on foreign advanced technologies, we developed this new DCGF model of isobar filling machine according to requirements from beer industry.
This machine is mainly applicable for beer bottled filling and capping. It is a more ideal filling and capping machine for middle or small-scale drink factories.
It has characteristics of more compact in structure, more reliable and safety in operation, ease in maintenance. It has an infinite variable speed device, so its output can be changed freely.
Parameters:Model | DGF12/6 | DGF18/6 | DGF24/6 | DGF32/8 |
Production capacity(500ml)(b/h) | 1000-1200 | 2000-3000 | 4000-5000 | 6000-8000 |
total power(kw) | 1.5 | 1.5 | 3.75 | 5.6 |
Dimension (L*W*H)(mm) | 1700x1100x2300 | 1830x1320x2300 | 1950x1580x2500 | 2100x1850x2500 |
Total weight(kg) | 2000 | 2400 | 3000 | 3500 |
Service Term1. InstallationThe initial installation is not included with the professional member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled. While our professional member arrives at the site for a completed and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days . The actual installation days many vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below. When initial installation is being called for our professional member required, the surcharge will be made advance by the purchase at US$80/person/day plus all travel expenses. Travel expenses include documentation fees visa charge); local and destination transportation charges air, train, ferry, bus, taxi or any means of transportation required to arrive to/from destination); accommodation (minimum of 3 star hotel facility) and 3 daily hot meals. 2. TranslatorIf translator is required and can't be provided by purchaser then we will provide a translator for same charge as initial installation stipulated above. All communicate with our engineer should be in Chinese. Any translation provide by us will be based between English and Chinese only. Purchaser is responsible for the translation between local language and English.Commercial Terms1. WarrantyAll parts are under two Year Warranty with defects from manufacturer. Any other defect caused by human error, mishandling, wear-and tear & any foreseeable conditions will not be covered by this warranty. All electronic parts and component can be guaranteed by original part's manufacturer or our company. 2. Payment30% of the total contract amount is to be T/T into assigned account at the period of 5 working days after the Purchase contract is signed.70% of the balance must to be made via T/T of the remainder balance amount of the purchase contract before the ordered equipment is to be delivered 10 working days prior of the shipment.We also accept L/C payment, 30% down payment, and 70% L/C at sight