=== Base Info ===
=== Description ===
Main Parameter
Model | FG-4 |
Capacity | Depend on bottle design | 5500-7200PCS/H |
Applicable Preform | Height | <330mm |
Neck | 20mm-25mm |
Applicable Bottle | Neck | 20-25mm |
Volume | Max.2Liter |
Height | Max.328mm |
Diameter | Max.105mm |
Electric consumption | Install power | 51kw |
Heating oven powder | 46kw |
Heating Oven operating power | 26kw |
Air consumption | Pressure | 4m3/min 4.0MPa |
Capacity | 4m3/min 4.0MPa |
Mold Chiller | Pressure | 4-6Bar |
Temperature | 6-13ºC |
Flow | 45L/min |
Oven Chiller | Pressure | 4-6Bar |
Temperature | 6-13ºC |
Flow | 26L/min |
Machine Dimension | L*W*H | 3900*900*2500mm |
Weight | 3500kg |
Capacity: 5000-5500BPH(based on 1L) |
Max. Volume: 2 Litter Total Size: Blowing Main machine: 3.6*1.3*2.3m Sorting machine:2*1.5*1.5m/Loader:3*1*1.5m |
Main electrics |
Pneumatic part& Cylinder | Valve | GERMAN FEST |
Electric part | PLC | JAPAN Mitsubishi |
Servo System | JAPAN Panasonic |
Frequency inverter | JAPAN Mitsubishi |
Operating system | JAPAN Mitsubishi |
Touch screen | JAPAN Mitsubishi |
Blowing | Valve | JAPAN Parker |
One-way Valve | GERMAN FEST |
Throttle Valve | GERMAN FEST |
Reducing Valve | GERMAN DURAY |
Note: All the electrical components adopts CE,UL,CCC approved international advanced high-tech product |
4. Our Services
1> The machine will be tested and checked at our workshop before delivery.
2>After one year, we will supply accessories are provided only one the cost price.
3> Free Spare Parts : Digital instrument, Sealing, Stretching cylinder seal ring, Mould-adjustment wrench, Furnace temperature table, Furnace heating tube and other relative vulnerable part.
4>Free production technology and process configuration.
5> We can help you to design the product line, workshop and provide turn-key project.
6>Installation: Experts' team to buyer's country after confirmation that the goods arrived in site and civil works completed get ready for installation. Funds for trip need to be payed by client and extra salary $100/day during the engineer's journey.
7>Warranty: One year from the date of Installation or acceptance of the Plant whichever comes first