Automatic Big Bottled Beverage Mineral Water Filling Machine

Changzhou Jian Jin Protective Products Co., Ltd. / 2022-07-05

Automatic Big Bottled Beverage Mineral Water Filling Machine

  • Warranty:1
  • Condition:New
  • Customized:Customized
  • Voltage:380V
  • Composition:Filling Machine
  • Processing Material:Water

=== Base Info ===

  • Model NO.:xgf
  • Process:Frozen and Chilled
  • Capacity:1000bph
  • Certificate:ISO9001
  • Warranty Period:2 Years
  • Transport Package:International Standard Export Package
  • Specification:SGS, CE
  • Trademark:Beyond
  • Origin:China, Zhangjiagang
  • HS Code:8422301090
  • Production Capacity:20sets Per Month

=== Description ===

Basic Info.

Model NO. xgf Process Frozen and Chilled Capacity 1000bph Certificate ISO9001 Warranty Period 2 Years Transport Package International Standard Export Package Specification SGS, CE Trademark Beyond Origin China, Zhangjiagang HS Code 8422301090 Production Capacity 20sets Per Month

Product Description

xgf series 4L-10L big Bottled Water Washing Filling Capping Machine Automatic Big Bottled Beverage Mineral Water Filling Machine


The 4L/10L botted water washing filling capping machine
Includes the washer, dryer, filler and capper for the production of 4L-10L water bottle

Three- progress for washing the bottle of 5L/10L bottled water washing filling capping machine:
Washing inside and outside by alkalescent liquid, washing inside and outside by disinfectant water, washing inside and outside by pure water

A)The 5L/10L bottled water washing filling capping machine alkalescent liquid and disinfectant water can be cycling used.

B)The 5L/10L bottled water washing filling capping machine washing, filling and sealing pricess is controlled by PC, and has the safe device for interlock, signal and self-detection.

C)The whole automatic 5L-10L bottled water washing filling capping machine
Is made of the stainless steel, meets the demands of food hygiene, with the feature of reasonable structure, easy in operation, exact actionm, it's the ideal equipment for the barreled water
Capacity300b/h
Washing Head4

Filling Head

4
Capping Head2

Barrel Size

4L-12L Plastic bottle

Power Supply

Single-phase or three-phase

Power

2kw

Air Consumption

80L/min

Air Pressure

0.45-0.5Mpa

Weight

2000kg

Dimensions(mm)

2200×1500×2500

Material

304stainless steel

Frequency changer

Mitsubishi

PLC

Mitsubishi

Contactor 

SIEMENS

Switch

Autonics

Min.Circuit Breaker

Delixi

Automatic Big Bottled Beverage Mineral Water Filling MachineAutomatic Big Bottled Beverage Mineral Water Filling MachineAutomatic Big Bottled Beverage Mineral Water Filling MachineAutomatic Big Bottled Beverage Mineral Water Filling MachineAutomatic Big Bottled Beverage Mineral Water Filling Machine
Service Term

1. Installation
The initial installation is not included with the professional member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
 
While our professional member arrives at the site for a completed and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days  . The actual installation days many vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below.
 
When initial installation is being called for our professional member required, the surcharge will be made advance by the purchase at US$80/person/day plus all travel expenses. Travel expenses include documentation fees visa charge); local and destination transportation charges  air, train, ferry, bus, taxi or any means of transportation required to arrive to/from destination); accommodation (minimum of 3 star hotel facility) and 3 daily hot meals.
 
2. Translator
If translator is required and can't be provided by purchaser then we will provide a translator for same charge as initial installation stipulated above. All communicate with our engineer should be in Chinese. Any translation provide by us will be based between English and Chinese only. Purchaser is responsible for the translation between local language and English.

Commercial Terms
1. Warranty
All parts are under two Year Warranty with defects from manufacturer. Any other defect caused by human error, mishandling, wear-and tear & any foreseeable conditions will not be covered by this warranty. All electronic parts and component can be guaranteed by original part's manufacturer or our company.
 
2. Payment
30% of the total contract amount is to be T/T into assigned account at the period of 5 working days after the Purchase contract is signed.
70% of the balance must to be made via T/T of the remainder balance amount of the purchase contract before the ordered equipment is to be delivered 10 working days prior of the shipment.
We also accept L/C payment, 30% down payment, and 70% L/C at sight
 

 
Automatic Big Bottled Beverage Mineral Water Filling Machine
Automatic Big Bottled Beverage Mineral Water Filling Machine

Copyright 2024 357th.com All Rights Reserved