Goodeng GD320C-LS pipeline crossing machine high working speed hdd rig

Zhejiang Weigang Technology Co., Ltd. / 2022-06-23

Goodeng GD320C-LS pipeline crossing machine high working speed hdd rig

=== Base Info ===

=== Description ===
Rig Weight10500 kgDimension(L*W*H)7300*2150*2250(mm)Max. Push&Pull Force350/700 kNMax. Torque12600 N·mMax. Push&Pull Speed40 m/minMax. Rotation Speed140 r/minEngine Power154 kWMax. Mud Pump Flow320 L/minCaterpillar Walking Speed3.5-6.0(km/h)Max. Mud Pump Pressure8 MpaEntry Drill Angle12°-22°Max. Climbing Gradient18°Max. Aperture Diameterø1100mm (Soil Depended)Max. Crossing length400m (Soil Depended)

Goodeng GD320C-LS pipeline crossing machine high working speed hdd rig

1.Cummins engine .
2.Rotation adopts Eaton large torque motor.
3.Push & pull adopts American Eaton motor and Push & pull one-piece reducer with three gears speed regulation.
4.Walking hydraulic driving device Steel track walks with double speed by wire-control.
5.The rotating cab is optional, with AC, broad vision, and comfortable seat.
6.The cover shell is adopted with overall backflip.
7.Equipped with φ73×3000 mm or φ76×3000mm drill rod.
8.Reasonable Electric design.
9.High degree of automation, with optional automatic drill rod greasing system, auto anchor, auto loading.
10.The rig shape style is"people-oriented".
11.The driving head and rotation hydraulic system of driving head with Parallel control technology and hydraulic components,and independent cooling system

Goodeng GD320C-LS pipeline crossing machine high working speed hdd rig

Goodeng GD320C-LS pipeline crossing machine high working speed hdd rigGoodeng GD320C-LS pipeline crossing machine high working speed hdd rigGoodeng GD320C-LS pipeline crossing machine high working speed hdd rig

1. What about the warranty time?

    A:12 months after shipment or 2000 working hours,whichever occurs first.

2. What about the delivery time?

    A:20 days after receiving the deposit.

3.What kind terms of payment can be accepted?

    A: On T/T term, 30% down payment is required in advance, and 70% balance shall be before shipment, or against the copy of original BL for old client.

       On L/C term, 100% irrevocable L/C without "soft clause" can be accepted. 

4.What logistics ways we can work for shipment?

    A: We can ship machine by sea and road. 

5. What about the after-sales service?

   A: We have office and professional after-sales service team in many countries. After you receiving the new machine, we will provide you one engineering training installation and debugging service for 3-5days. If there are some problems, our after-sales service team will arrive the project site in shortest time.

Copyright 2024 357th.com All Rights Reserved