THIS LINE IS CONSISTE OF: 1.80/156 Twin Screw Extruder 1unit 2, L=1320 Mould 1set 3, Dedicated Mould Temperature Controller 1set 4, Three Roller Calander 1unit 5. Dedicated Double Position Hot Laminating Platform 1unit 6, Cooling Stacker 1unit 7, Haul-off Machine 1unit 8, Lengthways Side Cutting Device 1unit 9, Board Cutting Machine 1unit 10, Riding wheel Platform 1unit 11, Electrical Device Full set
Optional Auxiliary Machine;
Crusher 1 unit
Mixer 1 unit
Pulverizer 1 unit
Air Compressor 1 unit
TRADE TERMS: Payment Term: 30% for prepayment by T/T, 70% for balanced payment by T/T, or L/C can be acceptable Delivery Time: 40 days after receipt of prepayment. Packing Method: Packing film or wooden case, 1*20 GP, 1* 40 GP. Guaranteed Time: 12 months
MACHINE RUNNING TEST AND AFTER SERVICE 1. When machine finished, we will invite client come to our factory to check the machine and do the machine test. If machine is ok, then client pay for the balance. And inspect machine load the container. 2. When machine arrives client's factory, if client needs, we will send 1-2 engineer to client's factory do the machine installation and running test, and also train the local worker how to operate and maintain the machine.