=== Base Info ===
=== Description ===
Name | Unit | FG40 | FG60 | FG80 | FG100 |
Screw diameter | mm | 40 | 45 | 50/55 | 60 |
L/D Ratio | | 22:1 | 22:1 | 22:1 | 22:1 |
Injection Capacity | 9 | 176 | 260 | 314 | 415 |
Heating power | KW | 7.5 | 10 | 10.8 | 12 |
Heating section | | 3+N | 3+N | 4+N | 4+N |
Main motor power | KW | 11 | 18.5 | 22 | 30 |
Total power | KW | 20 | 30 | 40 | 45 |
Operating power | % | 52-70 | 52-70 | 52-70 | 52-70 |
System pressure | Map | 14 | 14 | 14 | 14 |
Compressed air pressure | MPa | 0.7-1.2 | 0.7-1.2 | 0.7-1.2 | 0.7-1.2 |
Cooling water pressure | MPa | 0.3-0.4 | 0.3-0.4 | 0.3-0.4 | 0.3-0.4 |
Product maximum diameter | mm | 120 | 120 | 120 | 120 |
Product maximum length | mm | 200 | 220 | 220 | 220 |
Product volume | ml | 3-800 | 3-800 | 3-1000 | 3-1000 |
Dimensions | M | 3*1.3*1.7 | 3.5*1.4*1.8 | 4*1.6*2 | 4.5*1.8*2 |
Equipment weight | Ton | 3.5 | 5 | 8 | 10 |
Details images
Packaging & Shipping Our customers
Company Information
FAYGO UNION GROUP has 3 branch factories. One is FAYGOBLOW which design and make blow molding machine for PET, PE etc. FAYGOBLOW has 5 patents of invention, and 8 patents utility models. FAYGO PET blow molding machine is one of fastest and most energy-efficient design in the world. Second factory is FAYGOPLAST, which make plastic extrusion machinery, including plastic pipe extruding line, plastic profile extruding line. Especially FAYGOPLAST can supply high speed up to 40 m/min PE,PPR pipe line. Third factory is FAYGO RECYCLING, which research new technology in plastic bottle ,film recycling processing and pelletizing. Now FAYGO RECYCLING can make up to 4000kg/hr. PET bottle washing line, and 2000kg/hr plastic film washing line.Our factory is located in Zhangjiagang city, covers an area of 26,650 square meters. It only takes around two hours driving from SHANGHAI international airport. Welcome to visit our factory, and hope to cooperate with you in the near future.
Our Services1> The machine will be tested and checked at our workshop before delivery.
2>After one year, we will supply accessories are provided only one the cost price.
3>Free production technology and process configuration.
4>Installation: Experts' team to buyer's country after confirmation that the goods arrived in site and civil works completed get ready for installation. Funds for trip need to be payed by client and extra salary $60/day during the engineer's journey.
5>Warranty: One year from the date of Installation or acceptance of the Plant whichever comes first
6>We will reply you within 24 hours