Dong Guan Chun Hing Mechanical Technology Co., Ltd. / 2022-06-23
=== Base Info ===
=== Description ===
MXL-150D HYDRAULIC DEEP FOUNDATION CRAWLER ANCHOR DRILLING RIGConstruction SiteProduct ShowFeature&Technology
Common Construction Technology:
1. Anchor
2. Jet grouting
3. Mud Positive Circulating Drill
4. DTH hammer Impact Drill by air
5. DTH Hammer Impact Drill by Water
Main Features:
Apply to various construction techniques.
1. Anchor. It can be used in anchor drilling when the main shaft connects with drill rod/drill pipe, casing, also with casing-followed drill tools
2. Jet-grouting. It can be used with single pipe double-pipe and triple-pipe jet grouting etc.t can meet the following construction technique after equipped different module.
3. Dewatering for foundation pit
4. Micro-pile
5. Geothermal hole (water well) engineering
Based on different stratum, we can adjust torque and rotary speed of drilling rig to increase drilling rig's adaptability. At the same time, we can adjust torque and rotary speed based on client's request.
With the crawler, it has the following technical features fast mobility, accurate location, time-saving, good reliability and stability
It can reduce labor intensity and increase efficiency after equipping the clamping and breaking device.
Production FlowAbout usTraining
CertificatePackaging and TransportationFactory showExhibitionOur products have been exported to many oversea countries such as Malaysia, Vietnam, Singapore, Iran, England, Canada, Kampuchea, Indonesia and Africa.
FAQ:
Q: Are you original manufacturer?
A: Yes, ANMAN is manufacture in anchor and jet grouting machinery in China for more than 20years.
Q: Which payment terms are available to us?
A: T/T term or L/C term. On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment. On L/C term, a 100% irrevocable L/C without "soft clauses" can be accepted.
Q: Which Incoterms 2010 terms can we work?
A: ANMAN is a professional and international company, accept all Incoterms 2010 terms, normally we work on FOB, CIF, CFR, CIP.
Q: How long will the delivery time take?
A: Normally it will take about 30-40 days to produce the ordered machines.
Q: How about your sales performance in China?
A: We have more than 2000 active customers in China. The leading market share of same function products in domestic fields.
New product
Hot product
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23