Production Line for Cross-Linked PE Heat Shrinkable Sleeve
/ 2022-07-04
=== Base Info ===
=== Description ===
TJ-700 adhesive mixing and coating line (TJ-700)
1
Unpowered uncoil device
1 Set
2
Basic film drawing mill
1 Set
3
reactor
1 Set
4
Adhesive coating mold group
1 Set
5
Cooling water tank
1 Set
6
Haul-Off Unit
1 Set
7
Coiler platform
1 Set
Our Services Quality guarantee period: 12 months or 14 months from the date of Bill of Lading. During this period, the seller will provide free service for all problems caused by the quality of equipment, however except the problems caused by the buyer because of the wrong operation. Service: The seller would send technicians to the buyer's factory to test the new machine and train the workers of the buyer. The buyer should pay for round-trip transportation expenses, food, accommodation, insurance locally and related salary.