Sollroc Hql80A Down The Hole DTH Hammer
Shenzhen Shentian Sunking Smartcard Technology Co., Ltd. / 2022-07-04
- Certification:ISO 9001:2008
- Standard:ASTM
- Surface Treatment:Polishing
- Manufacturing Process:Forging
- Material:Alloy Steel
- Shank:Ql80
=== Base Info ===
- Model NO.:HQL80A
- Transport Package:Carton+Plywood Case
- Specification:HQL80A
- Trademark:SOLLROC
- Origin:China
- Production Capacity:10000,Month
=== Description ===
Basic Info.
Model NO.
HQL80A
Transport Package
Carton+Plywood Case
Specification
HQL80A
Trademark
SOLLROC
Origin
China
Production Capacity
10000/Month
Product Description
About usWe are a leading manufacturer of rock drilling tools, like DTH hammers and bits, DTH drill pipes, RC hammers and bits, tophammer button bits, coupling, cross bits, drill rods located in Changsha, Hunan, China.
We have rich experience in this field of DTH hammers and bits for 20 years.
Owing to high quality, professional serivce and competitive price, we have gotten good reputation from our customers from all over the world, such as France, Spain, Italy, South Africa, Iran, Malaysia, Australia ad etc.Product specifications:shank | QL80 |
Length(less bit) | 1330mm |
External diameter | 185mm |
Top sub thread | API 4 1/2"REG |
Weight(less bit) | 171kg |
Hole range | 195mm-254mm |
Working pressure | 1.0-3.0Mpa |
Impact rate at 1.4Mpa | 22Hz |
Recommended rotation speed | 15-25r/min |
1.0Mpa | 12m³/min |
Air consumption 1.8Mpa | 22m³/min |
2.4Mpa | 28m³/min |
We can also provide related products DTH hammers, ODEX system, symmetrix systems, slide block drilling systems, etc and DTH drilling pipes for various thread API REG, API IF, BECO, etc.Product photosQuality warranty:Our products are made of high quality steel and all spares parts are inspected strictly before shipping. We have quickly responses for your complaint and suggestion.Package:Using ply-wooden cases and pallet for package to protect the products and avoid the damagement during transportation. Also we can customize package according to your special requests.Production time:Generally need 15-25 daysTransportation:By air, By Express or By sea according to your requests.