Jiangyin Yiran International Trading Co., Ltd. / 2022-07-05
=== Base Info ===
=== Description ===
Related note:
1. All equipment: (machines and components) by the People's Republic of standards, safety regulations to create supply.
2. All equipment: Power supply, voltage 380/220V ± 10% 50Hz, special purpose users, please note in advance.
3. Plant construction manual, the equipment layout technology plans, electrical layout, etc. To be sent after signing a contract to pay.
4. To send the guidance of the production line installation and commissioning engineers to guide the location of installation. For the installation to go abroad for staff travel costs and accommodation at the local, transportation and other costs borne by the demand side.
5. The following is not within the scope of supply
A. Plant and construction, design, construction (including the workshop with lighting, water supply, fire fighting system).
B. Water, electricity, gas-owned (through production).
C. Environmental protection facilities and equipment.
D. Debugging packaging materials and bags.
E. Self-demand-side of (Frederick) post-mortem room and a machine repair workshop.
6. The complete sets of equipment in addition to the actual production equipment conditions, as varieties of raw materials, utilities conditions, skill level involved in the operation to another.
7, the production line for 120 days, testing time is 30 ~ 50 days.
New product
Hot product
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23