PE Carbon Spiral Reinforcing Pipe Production Extrusion Line

Ningbo Zhaoke Int'l Imp. & Exp. Corp / 2022-07-04

PE Carbon Spiral Reinforcing Pipe Production Extrusion Line

=== Base Info ===

=== Description ===
production   line   arrangementextruderSJ-90/30BSJ-65/30Bdie75-20050-150sizing   troughSGZL-200SGZL-150tractorSLQ-200SLQ-150winding   machineSQ-200SQ-150  



TRADE TERMS

  1. Payment Term: 30% for prepayment by T/T, 70% for balanced payment by T/T, or L/C can be acceptable
  2. Delivery Time: 40 days after receipt of prepayment.
  3. Packing Method:  Packing film or wooden case
  4. Guaranteed Time:  12 months

MACHINERUNNING TEST AND AFTER SERVICE
  1. When machine finished, we will invited client come to our factory to check the machine and do the machine test. If machine is ok, then client pay for the balance. And inspect machine load the container.
  2. When machine arrives client's factory, if client needs, we will send 1-2 engineer to client's factory do the machine installation and running test, and also train the local worker how to operate and maintain the machine. It is chargeable.
  3. If have any question or problem on machine operation or maintain, welcome to contact to us by email or calling. We stand by 24 hours. 

PE Carbon Spiral Reinforcing Pipe Production Extrusion LinePE Carbon Spiral Reinforcing Pipe Production Extrusion LinePE Carbon Spiral Reinforcing Pipe Production Extrusion LinePE Carbon Spiral Reinforcing Pipe Production Extrusion LinePE Carbon Spiral Reinforcing Pipe Production Extrusion LinePE Carbon Spiral Reinforcing Pipe Production Extrusion LinePE Carbon Spiral Reinforcing Pipe Production Extrusion LinePE Carbon Spiral Reinforcing Pipe Production Extrusion LinePE Carbon Spiral Reinforcing Pipe Production Extrusion LinePE Carbon Spiral Reinforcing Pipe Production Extrusion Line


 

Copyright 2024 357th.com All Rights Reserved