=== Base Info ===
=== Description ===
Basic Info.
Computerized
Computerized
Certification
CE, ISO9001:2008
Raw Material
PVC.TPR.TPU
Transport Package
Container
Specification
ISO, CE
Trademark
KCLKA
Origin
Fujian, Jinjiang
HS Code
84773090
Production Capacity
25 Sets/ Month
Product Description
Advantages
1. This machine is specialized in single color, double color and three color Upper/sole/strip for slippers and sandals with the raw material of PVC;
2. Adopting PLC programme control of industrial grade man-machine interface, display of touching screen.
3. Double-ratio hydraulic system;
4. Accurate digital measurement;
5. Ration layout,easy to operate and it can be run without professionals;
6. Energy-saving ,less laborer, high production;
It has stronger adaptability, uppers of single, double, three color can be chosen freely.
Specifications
Item | Unit | Specification |
Raw material | | PVC |
Work station | Pca | 6,8 |
Screw diameter | mm | 45x2 55 |
Screw speed | r/pm | 0-135 |
Injection capacity | cm3 | 240x2 350 |
Injection hydraulic | Mpa | 35 |
Clamping force | Kn | 600 / 800 |
Power of motor | kw | 15x2 |
Machine size Ixwxh | mm | 6700x2500x1650 |
Machine weight | Kg | 6500 |
The trading term
Delivery data:Within 30 days after receive deposit
Payment term: T/T L/C Advance payment at order 30%, 70% before shipment
Delivery State: Machines were taken apart and packed in suitable package.
For the training and installation, we will send the technician to your factory. And you just need to afford the cost of their trip and payment.
Common FAQ:
Q: Can you do our own packaging?A: Yes, you just provide the package design and we will produce what you want. We also have the professional designer can help you do the packaging design.Q: How many different types of products your company manufactures?
A: Now we have more than 1,000 products. We have a strong advantage of OEM, just give us the actual products or your idea that you want, we will manufacture for you.Q: When can I get the price?
A: Usually we quote within 8 hours after we get your inquiry.Q: What's your MOQ?A: If we have the products in stock, it will be no MOQ. If we need to produce, we can discuss the MOQ according to customer's exact situation. Q: How long is your delivery time?
A: The general delivery time is 30-45 days after receiving your order confirmation. Anther, if we have the goods in stock, it will only take 1-2 days.
Q: Do you provide sample ? Is it free?
A: If the sample is low value, we will provide the free sample with freight collect. But for some high value samples, we need to collect the sample charge.