New Automatic Four Cavities Plastic PVC Electrical Conduit Extrusion Pipe Production Line ...

Ningbo Conwhole Hardware Co., Ltd. / 2022-07-04

New Automatic Four Cavities Plastic PVC Electrical Conduit Extrusion Pipe Production Line ...

=== Base Info ===

=== Description ===
PVC four pipe extrusion production linePipe range 16mm-32mmExtruder model SJSZ-65/132 twin conical screw extruderFour station haul-off Up&down two caterpillar trackingProduction speedMax 10m/min
Equipment list of the 4 PVC pipe production line:

NO.Equipment NameDescriptionmachinery photos
1SJSZ65/132 conical twin
screw extruder
Unique screw design, short plasticizing time, good compounding and plasticizing effect.New Automatic Four Cavities Plastic PVC Electrical Conduit Extrusion Pipe Production Line Making Machine
2molds for 16-32mm(4 cavity)Four even flow channel with chrome plated, pressure of four channels are stable, final product size stable.New Automatic Four Cavities Plastic PVC Electrical Conduit Extrusion Pipe Production Line Making Machine
3Four cavities water cooling tankMade of stainless steel, vacuum forming and water coolingNew Automatic Four Cavities Plastic PVC Electrical Conduit Extrusion Pipe Production Line Making Machine
4Four caivites pullerFour individual pullers, it is easy to operate and adjust machine.New Automatic Four Cavities Plastic PVC Electrical Conduit Extrusion Pipe Production Line Making Machine
5Four cavities cutterno chip cut, high accuracyNew Automatic Four Cavities Plastic PVC Electrical Conduit Extrusion Pipe Production Line Making Machine
6stacker1setNew Automatic Four Cavities Plastic PVC Electrical Conduit Extrusion Pipe Production Line Making Machine


AFTER SERVICE
Technical documentation
All symbols on the equipment will be in English. We will be responsible for providing the Buyer with a general layout plan, electrical plan, installation orientation and manuals, in English.
Arrangements for inspection, installation and testing of the equipment
a. After all of the equipment is delivered to the customer's factory, the Buyer shall be responsible for all preparation work, e.g. electricity supply, water supply, cranes and labor, etc.
b. We will prepare visa applications for their engineers, who will assist in the equipment installation and testing at the Buyer's factory.  
c. The Buyer will buy a round-trip air ticket for the engineer(s) after the visa application is approved. The Buyer is responsible for all expenses generated, e.g. visa application fees, meals, accommodation and an allowance of $80.00 per day for each engineer.
d. The engineer(s) will provide free training for the operators and maintenance people, in Buyer's factory.
e. If the Buyer does not request commissioning by our engineer(s) within four months from the date of the bill of lading, it will be accepted that all the equipment has been successfully tested and approved by the Buyer.
Quantity and quality guarantee
a. In cases of quantity discrepancies or equipment damage, at the destination, the Buyer will file a claim within 30 days after the arrival of the goods at its destination. The insurance company and the shipping company will be responsible for all discrepancies and damage caused by the shipping company or other transportation companies. 
b. Guarantee period and after-sales services: 13 months from the date of the bill of lading.
During this guarantee period, if there is a quality issue, we will provide spare parts without charge. If malfunctions are caused by the Buyer's improper operation of equipment, we will provide the Buyer with spare parts at cost prices. 
c. Long-term service:
Beyond one year, we will provide the Buyer with spare parts at reasonable prices and provide long-term technical guidance.


New Automatic Four Cavities Plastic PVC Electrical Conduit Extrusion Pipe Production Line Making Machine



 

Copyright 2024 357th.com All Rights Reserved