Africa Gold Ore Plant, Gold Mining Plant, Gold Wash Plant, Barrack Gold Plant, Gold ...

Dongguan Sharing Environmental Protection Technology Co., Ltd / 2022-07-04

Africa Gold Ore Plant, Gold Mining Plant, Gold Wash Plant, Barrack Gold Plant, Gold ...

  • Model No.:Gp-1
  • Structure:Gold Plant
  • Price:Factory Price
  • Delivery:Sea Transportation
  • Drawing Documennt:Offer
  • Installation:Engineer Oversea Service

=== Base Info ===

  • Model NO.:mining machine
  • Guarantee:1 Year (Wearing Parts Excluded)
  • Spare Parts:1 Year for Free
  • Sale After Service:Supply for Whole Using Time
  • Certification:CE:Cmhn1305132313 ISO9001:2008
  • Transport Package:Export Standard
  • Specification:International standard
  • Trademark:HengXing
  • Origin:Henan China
  • Production Capacity:40-80tph

=== Description ===

Basic Info.

Model NO. mining machine Guarantee 1 Year (Wearing Parts Excluded) Spare Parts 1 Year for Free Sale After Service Supply for Whole Using Time Certification CE:Cmhn1305132313 ISO9001:2008 Transport Package Export Standard Specification International standard Trademark HengXing Origin Henan China Production Capacity 40-80tph

Product Description

Hengxing produce complete set gold  mining machine for various nature gold  we mainly process equipments for such gold: 1 rock gold 2 alluvia gold

General flow process for processing rock gold:(design may vary when gold nature different)
Africa Gold Ore Plant, Gold Mining Plant, Gold Wash Plant, Barrack Gold Plant, Gold Elution Plant, Gold Mining Equipment, Gold Mining Machine
Africa Gold Ore Plant, Gold Mining Plant, Gold Wash Plant, Barrack Gold Plant, Gold Elution Plant, Gold Mining Equipment, Gold Mining Machine


 
 Four Steps Of  gold ore plant(Gold ore,Iron ore)

Step1:Crushing-- Put the ingredients broken 
      1)process introduction: Due to the volume of ore produced is too large , so it is necessary to the mined ore crushing. In this process , send the ore into the crushing device to crushed . In general, The System requirements of the ore particle size for general 12mm------18mm.
       2).Main Equipment:  Jaw crusher,impact crusher,hammer crusher,cone crusher etc
   

Step2:Grinding--The processing of raw materials carefully
      1) Process introduction: In this process, we must first make clear the requirements for each ore solution particle standards, Based with the aid of various equipment, put all sorts of ore grinding to separation units required unit solution size.
 
      2).Main Equipment:Feeder,Ball Mill,Classifier, Overflow ball mill,etc.

             

Step3: Sorting --Select fine ore powder
         1).Process introduction: In the production process,not all the ore powder are in line with the standard . we need to filter the ore powder . In this process We use professional equipment to elect qualified concentrate powder from ore , eliminated does not meet the criteria for ore.
      2).Main Equipment:Mixing machine ,Flotate separator,magnetic separatoretc.


step4:Dehydration --Take off water in the ore
      1).Process introduction: Due to various constraints, after the front of several processes , there are always some residual moisture in the ore powder, then we need to pick out concentrate dehydration, to meet the requirements of transportation and smelting.
 
      2.)Main Equipment:Vacuum filter,Box pressure filter,Folding belt filter,Ceramic filter,Vacuum pump, Driving thickener,etc.


 

 

Copyright 2024 357th.com All Rights Reserved