Dongguan Sibeike Industrial Investment Co., Ltd. / 2022-07-04
=== Base Info ===
=== Description ===
FAQ
Q: How to install ?
A: 1., a floating box landing, the two through the tube into the floating box hole, inserted in the side of the tube, a piece of wood pad, so that the lateral tilt
2. drop another pontoon and point it through two tubes
3. after the tube is inserted, the tube is fixed by the bolt
4.. Enlarge the plate to the tank and use the U card to fix it
5., the upper part of the excavator hoist, put on the market, with wide eyes on the Qi, tighten the screws
6. connect the hydraulic oil pipe, connect the oil pipe of the motor on the float box to the excavator
Q:How to operate?
A : 1., prohibit the operation of more than 1.6 meters water depth, silt is not limited to depth
2., prohibited in the uneven, the left and right sides of the floating box, the focus of great disparity in the situation, walking operations
3. amphibious excavators use slow gear while walking, and do not use fast gear
4., start the walking state, the first step on the foot of the throttle, and then walk
5. do not press hard objects while walking
6. avoid long walking on the hard surface
7. when turning, the front of the floating body can be lifted by the power of the bucket, and when the angle is shifted, the running of the chain plate can be avoided, and the derailment of the chain plate can be avoided
Q: How to maintain?
A:1. ensure the chain tension, loose situation should be adjusted to 3-5, a chain wheel suspension track shall prevail
2. ensure that the seat four screws, and ensure ten days (or work 80 hours) to beat the butter
3. top silk, beat butter once a week
Check the screws between the 4. chains and the chain, check the screws frequently and keep the screws tight
New product
Hot product
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23