Hot sale GD360-LS Goodeng Horizontal Directional Drilling Machine

Zhejiang Weigang Technology Co., Ltd. / 2022-06-23

Hot sale GD360-LS Goodeng Horizontal Directional Drilling Machine

=== Base Info ===

=== Description ===
Rig Weight9500/10500 kgDimension(L*W*H)7300*2230*2310(mm)Max. Push&Pull Force380/760 kNMax. Torque14000 N·mMax. Push&Pull Speed36 m/minMax. Rotation Speed135 r/minEngine Power153 kW/154 kWMax. Mud Pump Flow400 L/minCaterpillar Walking Speed2.5-4.0(km/h)Max. Mud Pump Pressure8 MpaEntry Drill Angle13°-23°Max. Climbing Gradient18°Max. Aperture Diameterø1200mm(Soil Depended)Max. Crossing length450m(Soil Depended)Hot sale GD360-LS Goodeng Horizontal Directional Drilling Machine1.Cummins engine.
2.Military technology hydraulic gear pump.
3.Push & pull and rotation hydraulic system adopt series of parallel control technology and the international first-class components.
4.Rotation and push & pull pilot control.
5.The power head rotation is driven by the Eaton motor achieves infinitely variable speed. Push & pull adopts Eaton motor and three gears speed regulation.
6.Driving head reserves reinforced power - push & pull force.
7.Wire-control steel track walking with hydraulic driving.
8.Man-machine construction manner .
9.φ73×3000 mm or φ76×3000mm or φ83×3000mm drill rod.
10.Reasonable electric design.
11.Rig shape is"people-oriented".
12.Rig is advanced, and the working efficiency has been improved by 30%.
13.Humanization design:the mechanical arm ,air-condition cab , rod-loading box, auto anchor, auto thread oil machine etc.
14.The DCI Aurora colorful display screen dashboard.

Hot sale GD360-LS Goodeng Horizontal Directional Drilling Machine
Hot sale GD360-LS Goodeng Horizontal Directional Drilling Machine
Hot sale GD360-LS Goodeng Horizontal Directional Drilling MachineHot sale GD360-LS Goodeng Horizontal Directional Drilling Machine

1. What about the warranty time?

    A:12 months after shipment or 2000 working hours,whichever occurs first.

2. What about the delivery time?

    A:20 days after receiving the deposit.

3.What kind terms of payment can be accepted?

    A: On T/T term, 30% down payment is required in advance, and 70% balance shall be before shipment, or against the copy of original BL for old client.

       On L/C term, 100% irrevocable L/C without "soft clause" can be accepted. 

4.What logistics ways we can work for shipment?

    A: We can ship machine by sea and road. 

 5. What about the after-sales service?

    A: We have office and professional after-sales service team in many countries. After you receiving the new machine, we will provide you one engineering training installation and debugging service for 3-5days. If there are some problems, our after-sales service team will arrive the project site in shortest time.

 

 

Copyright 2024 357th.com All Rights Reserved