Trash Basket/ Garbage Cans Hot Foil Stamping Machine (HN-58A)

Hefei Honor Automation Technology Co., Ltd. / 2022-06-27

Trash Basket/ Garbage Cans Hot Foil Stamping Machine (HN-58A)

  • Classification:Intermittent Stamping Machine
  • Plate Type:Screen Printer
  • Color & Page:Single Color
  • Suitable Material:Plastic
  • Automatic Grade:Semi-Automatic
  • Application:Leather Heat Transfer, Labels and Tags

=== Base Info ===

  • Model NO.:HN-58A
  • Usage:Label Printer
  • Hot Stamping Pressure Factor:Hot Stamping Temperature
  • Decisive Factor:Temperature
  • Gilding Area(mm):400*500mm
  • Heating Power:4.5kw
  • Heating Plate Range:330mm
  • Gilding Pressure:10t
  • Gilding Temperature:0-300centigrade
  • Adjustable-Speed:6s
  • Weight(Net/Gross):2.9t
  • Packing Size (M):1.45*2.6m
  • Transport Package:Wood Case
  • Specification:4.5kw
  • Trademark:honor
  • Origin:China
  • HS Code:84431980
  • Production Capacity:50000sets,Year

=== Description ===
HN-58 Hot Stamping Machine For Waste BinsGilding area(mm)400×500mm Heating power   4.5kwHeating plate range 330mmGilding pressure 10TVoltage 380V   50HZPacking size  (m)1.45×1.4×2.6mWeight(Net/Gross) 2.9TGilding temperature 0~300ºCAdjustable-Speed 6s
Trash Basket/ Garbage Cans Hot Foil Stamping Machine (HN-58A)

Trash Basket/ Garbage Cans Hot Foil Stamping Machine (HN-58A)
Trash Basket/ Garbage Cans Hot Foil Stamping Machine (HN-58A)

Feature:
 

  1. Foil feed and collected automatically.
  2. Automatic stamping process, putting and taking off article by hand, other process done fully automatically.
  3. Vertical pressure cylinder design to make high and stable high pressure max can be 10 ton.
  4. Temperature controller heat to ensure stable printing temperature.
  5. Worktable can be adjusted up and down.
  6. Stamping head can be fine adjusted makes bronzing more precision.
  7. Print speed, pressure, temperature and time are adjustable.
  8. Manual and semi automatic print modes
Power Supply: 220V/380V, 50/60HZ

Standard Certificate: ISO9001-2000   CE certificate

Country of Origin: Hefei, China

Payment Terms:50% T.T for deposit, 50%TT after machine finished and before shipping.

Lead time: Within 30 days when get buyer's payment or deposit

Shipment: by air or by sea

Guaranty: one year

Packing:       by wooden case

Packing size: 1.45×1.4×2.6m

Packing volume: 5.3 CBM

Gross weight: 2.9T

Suggestions by factory:
  1. Please test your artwork on the machine many times to get the best temperature and pressure, so get the best printing and engraving.
  2. Foil and temperature should be tested before mass production.
  3. Dry, ventilated, good light condition helps bronzing better.

Factory Show

Welcom to visit our fatory !
Trash Basket/ Garbage Cans Hot Foil Stamping Machine (HN-58A)

Trash Basket/ Garbage Cans Hot Foil Stamping Machine (HN-58A)

Trash Basket/ Garbage Cans Hot Foil Stamping Machine (HN-58A)




Our Service

1.We can provide "one-stop purchasing" or "package program" system solutions and owns professional manufacturing equipment as well as a full range of technical support and after-sale service.

2. OEM, Customized can be all accepted.

3. Contact us any time when you feel free.

 

Package Show

Trash Basket/ Garbage Cans Hot Foil Stamping Machine (HN-58A)
 

FAQ

Q: Can your machine be customized ?

A: Yes, we are a professional manufacturer specilized in palletizing robot, packaging machine, conveyor etc. for more than 10 years and we have a strong design&technical team. We can design and manufacture as per your requirements.

Q: How to get an accurate quotation ?

A: Please provide us the detail of the workpiece such as drawing and dimensions.

Q: What's the shipping cost from China to your country ?

A: We can send machine to your port by sea or other term you need. Please kindly tell us your nearest port or address with code. We have reliable shipping agent to ensure the safe, convenient and timely delivery.

Q: Payment terms, MOQ, warranty, Trade Terms

A: Payment terms: 30% down payment against order by T/T, the balance of 70% to be paid on delivery.                   

Minimum order quantity: 1 set, FOB Shanghai

Delivery time: about 20-30 working days after receipt of formal order and 30% deposit.

Warranty: 12 months following delivery. We offer online service 24 hours all day long, Skype, 

Email etc. You can contact us any time, if urgently, please call us.

Q: what's the package ?

A: All goods are packed in wooden box 

Q: Do you offer Installation&debugging?

A: Our engineers are available to service machinery overseas to help customers to solve machine problems.

 bag packing machine

packing machine

Q: what's policy for guarantee and broken parts ?

A: As for machine products, our company provides 12 months for all mechanical parts with the exception of electrical and electronic parts and those subjects to normal wear and tear. Meanwhile, the guarantee starts from the shipment (B/L date). The guarantee is intended limited to the replacement of the broken part after checking the construction fault. The inspection of the causes of the trouble or the breakdown of the parts is exclusively up to the manufacturing company. All in all, our company can offer you assured products.


 

Copyright 2024 357th.com All Rights Reserved