=== Base Info ===
=== Description ===
Item | Description | Data |
1 | Raw material vacuum feeding machine | 1 set |
2. | High efficiency single screw extruder 150/33 with PLC control | 1 set |
3 | Hydraulic exchanging unit | 1 set |
4 | T-type die head-JC-times brand | 1 set |
5 | Three roller calendar-vertical type, alloy steel material | 1 set |
6 | Rollers theromocontrolling machine-oil circulation cooling | 1 set |
7 | Cooling frame/rollers conveyor | 1 set |
8 | Trimming units-cross saw cutting units | 1 set |
9 | Haul off machine-2 pieces of NBR rubber rollers | 1 set |
10 | Plastic cutting machine-guillotine and saw cutting machine | 1 set |
11 | Stacker | 1 set |
12 | Water chiller | 1 set |
13 | Electrical cabinet | 1 set |
PART 3 DELIVERY, PAYMENT AND SERVICES:
1. delivery time: 50 days after receiving the deposit
2. payment terms:30% for the prepayment by T/T and 70% for the downpayment by T/T before delivery or irrevocable L/C at sight can be available, too.
3. Packing details: wooden pallets and cases with stretching films
4. Guaranteed time: 18 months for the machenical parts and 12 months for the electrical parts.
5. Service: we will send 1-2 engineers to customers' factory to help them install, test the machine and also train their workers, but customers should bear the round tickets, accommodation, and salary etc.