High Quality Can Beer Filling and Sealing Machine

Changzhou Jian Jin Protective Products Co., Ltd. / 2022-07-05

High Quality Can Beer Filling and Sealing Machine

  • Condition:New
  • Customized:Customized
  • Voltage:380V
  • Composition:Filling Machine
  • Processing Material:Garden Products
  • Process:Frozen and Chilled

=== Base Info ===

  • Model NO.:FBZ-1
  • Control:PLC
  • State:New
  • Certificate:ISO9001,SGS,CE
  • PLC:Mitsubishi
  • Transport Package:Wooden Package
  • Specification:CE, ISO9001
  • Trademark:Beyond
  • Origin:China, Zhangjiagang
  • HS Code:8422309010
  • Production Capacity:1000PCS,Year

=== Description ===

Basic Info.

Model NO. FBZ-1 Control PLC State New Certificate ISO9001/SGS/CE PLC Mitsubishi Transport Package Wooden Package Specification CE, ISO9001 Trademark Beyond Origin China, Zhangjiagang HS Code 8422309010 Production Capacity 1000PCS/Year

Product Description

High Quality Can Beer Filling and Sealing Machine
High Quality Can Beer Filling and Sealing Machine

 Feature:
1. Based on foreign advanced technologies, we developed this new GD model of isobaric filling machine according to requirements from drink industry.

2. This machine is mainly applicable for filling carbonated drink and beer into ease-open cans.

3. It is a more ideal filling machine for middle or small-scale drink factories. It has characteristics of more compact in structure, more reliable and safety in operation, ease in maintenance. It has an infinite variable speed device, so its output can be changed freely.

4. Glass bottled vinegar or sauce or can beer.

5. Capacity: From 1000BPH to 2000BPH.

Porta presenta su nueva linea de vinagres y acetos inspirados en un alto respeto por la calidad del producto, las diversas necesidades y gustos de los consumidores.

 
 MODELFBZ-1
 CAPACITY 2000~2200BPH
 Suitable bottle height  (mm): H=170-340  Φ=50-95  PET/GLASS bottle
 Filling pressure  0.25-0.35
Capper heads 1heads
 Power source specification AC380V/50HZ
 method of capping Normal pressure filler
 Power 1.1KW(Installing equipment power 3 KW)
 overall dimension(mm)(L×W×H): 1300X1100X2000
 weight(kg)  1000
Service Term
1. Installation
The initial installation is not included with the professional member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
 
While our professional member arrives at the site for a completed and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days  . The actual installation days many vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below.
 
When initial installation is being called for our professional member required, the surcharge will be made advance by the purchase at US$80/person/day plus all travel expenses. Travel expenses include documentation fees visa charge); local and destination transportation charges  air, train, ferry, bus, taxi or any means of transportation required to arrive to/from destination); accommodation (minimum of 3 star hotel facility) and 3 daily hot meals.
 
2. Translator
If translator is required and can't be provided by purchaser then we will provide a translator for same charge as initial installation stipulated above. All communicate with our engineer should be in Chinese. Any translation provide by us will be based between English and Chinese only. Purchaser is responsible for the translation between local language and English.

Commercial Terms
1. Warranty
All parts are under two Year Warranty with defects from manufacturer. Any other defect caused by human error, mishandling, wear-and tear & any foreseeable conditions will not be covered by this warranty. All electronic parts and component can be guaranteed by original part's manufacturer or our company.
 
2. Payment
30% of the total contract amount is to be T/T into assigned account at the period of 5 working days after the Purchase contract is signed.
70% of the balance must to be made via T/T of the remainder balance amount of the purchase contract before the ordered equipment is to be delivered 10 working days prior of the shipment.
We also accept L/C payment, 30% down payment, and 70% L/C at sight
 
 
High Quality Can Beer Filling and Sealing Machine
High Quality Can Beer Filling and Sealing Machine


 

Copyright 2024 357th.com All Rights Reserved