=== Base Info ===
=== Description ===
Roller diameter
Upper roller | mm | Ø480 | Middle roller | mm | Ø480 |
Bottom roller | mm | Ø480 |
Roller length | | mm | 1300 |
The thickness of chrome surface | | mm | 0.1- 0.12 |
Surface chrome conditions | | class | 12 |
No. of rollers | | Pcs | 3 |
Max. Linear speed | | m/min | 2.2 |
Driving motor power | | kw | 2.2 |
Driving motor quantity | | Pcs | 3 |
Moving motor power | | kw | 0.75 |
Max. elevating dist. Of upper or bottom roller | | mm | 50 |
Towing linear velocityMin. | m/min | 1.5 | Max. | m/min | 15 |
Towing motor | | kw | 2.2 |
Width without edge | | mm | Up to 1050 |
Thickness of the sheetMin | mm | 4 | Max. | mm | 4 |
Width of the sheet | | mm | 1050 |
8.Final product bracket3.You just tell me what machine you want,let us do the rest work:
1. Design and manufacture suitble machine for you.
2. Before delivery, we will test the machine until you are completely satisfied. (You can come to our factory to inspect the running production line.)
3. Delivery.
4. We will provide after-sales service:
(1) Field installation and commissioning;
(2) Field training your workers; (3) Field maintenance and repair service ;
(4) Free Spare Parts ;
(5) Video/Online technical support.
4.Reviews by customers
5.You just tell me what machine you want,let us do the rest work:1. Design and manufacture suitble machine for you.
2. Before delivery, we will test the machine until you are completely satisfied. (You can come to our factory to inspect the running production line.)
3. Delivery.
4. We will provide after-sales service:
(1) Field installation and commissioning;
(2) Field training your workers; (3) Field maintenance and repair service ;
(4) Free Spare Parts ;
(5) Video/Online technical support.
6.Cooperation Brands
7.FAQ:
1.Are you manufacturer or trading company?
We are manufacturer.
2.Why choose us?
We have 20 years experience for producing machine.We can arrange for you to visit our local customer's factory.
3.Delivery time: 20~30 days.
4.Payment terms:
30% of total amount should be paid by T/T as down payment, the balance (70% of total amount) should be paid before delivery by T/T or irrevocable L/C(at sight).