Et Alluvial / Placer / Hard Rock Processing Gold Mining Equipment

L-Max Technology (Shenzhen) Limited / 2022-07-04

Et Alluvial / Placer / Hard Rock Processing Gold Mining Equipment

  • Type:Gravity Separator
  • Voltage:220V
  • Weight:5T
  • Material:Stainless Steel
  • Material Feature:Rust -Proof
  • Energy Saving:Energy Saving

=== Base Info ===

  • Model NO.:ET-50
  • Warranty:1 Year
  • Color:Customized
  • Customized:Customized
  • Condition:New
  • Mesh Material:High Manganess Steel Wire
  • Platform Material:4mm Anti-Skateboard
  • Shifting Unit:Wheel
  • 150through Particle:200mm
  • Application:Sand Gold Ore Extraction
  • Work Capacity:4-500tph
  • Size of Roller Screen:as Custoimized
  • Work Form:Chain Drive
  • Through Particle:150mm
  • Colour:Customized
  • Transport Package:Container
  • Specification:7.5*2*2.7m
  • Trademark:ET
  • Origin:Shandong China
  • HS Code:8467890000
  • Production Capacity:500per Year

=== Description ===

Basic Info.

Model NO. ET-50 Warranty 1 Year Color Customized Customized Customized Condition New Mesh Material High Manganess Steel Wire Platform Material 4mm Anti-Skateboard Shifting Unit Wheel 150through Particle 200mm Application Sand Gold Ore Extraction Work Capacity 4-500tph Size of Roller Screen as Custoimized Work Form Chain Drive Through Particle 150mm Colour Customized Transport Package Container Specification 7.5*2*2.7m Trademark ET Origin Shandong China HS Code 8467890000 Production Capacity 500per Year

Product Description

ET China High Recovery Rate Gold Mining Equipment / Mobile Gold Mining Equipment / Gold Rush Boat / Nielsen Centrifuge for Sale
                                   Et Alluvial / Placer / Hard Rock Processing Gold Mining Equipment











                    

                          Portable Gold Mining Machine Trommel Wash Plant
                          1.Mobile gold trommel is a new type screening equipment.
                          2.Mainly applied in sand screening, widely used in alluvial gold mining washing.
                          3.Has advantage of high capacity, convenient to move,easy operation characteristic etc,
                          4.It is popular in home and abroad. 

                           Et Alluvial / Placer / Hard Rock Processing Gold Mining Equipment
                           Et Alluvial / Placer / Hard Rock Processing Gold Mining Equipment
                           Et Alluvial / Placer / Hard Rock Processing Gold Mining Equipment
                           Et Alluvial / Placer / Hard Rock Processing Gold Mining Equipment
                           Et Alluvial / Placer / Hard Rock Processing Gold Mining Equipment





                          Et Alluvial / Placer / Hard Rock Processing Gold Mining Equipment
                         

                         
 
ModelDimensionScreen SystemPower System
5-10t2500*1000mm800*1500mm11KW
20-30t5000*1400mm1200*2500mm35KW
50t6500*1800mm1500*3000mm50KW
100t8300*2200mm1500*4500mm100KW
150t9200*2200mm1600*4800mm120KW
200t11500*2250mm1800*5000mm150KW
                         
                       
                     Et Alluvial / Placer / Hard Rock Processing Gold Mining Equipment
                     
                     ShanDong Eterne Mining Machinery Co.,Ltd.
                      1, Is large gold mining service company,Specialized in designing,manufacturing, installing
                      and debugging ofgold mining equipment as well as providing flow sheet design and course of
                      training of mining.

                      2,Our company was founded in 2015 year as one of leading manufacturer of gold mining equip
                      ment in China .


                      3,Main Products: Gold trommel, centrifugal concentrator, vibrating sluice, clay washer, vibrating
                      screen, gold dredger etc.was well sold both home and abroad.


                      4,Exported to Russia, Laos, Vietnam, Kazakhstan, Tajikistan, North Korea, the Philippines, Mon
                      golia, Myanmar, Papua New Guinea, Indonesia, Fiji, South Africa, Ghana, Benin, 

  
                     Et Alluvial / Placer / Hard Rock Processing Gold Mining Equipment
                   After-Sales Service

                  1,Design outlet with 3D drawing photo

                  2,Producing according to the design

                  3, Inspection and testing before delivery

                  4, Engineers installation and training service overseas   

  
                       Et Alluvial / Placer / Hard Rock Processing Gold Mining Equipment
                  Delivery Time:7-30 days, depend on orders;
                   1,LCL : Wood case or channel steel frame with iron piece 
                   2,FCL : Nude and firmed in container (20GP, 40GP, 40HQ)
                  FAQ     

                 1. Are you factory? 
                  Yes, established in 2002, over 15 years factory


                 2. How big are you?
                  In total 6 work shops, 15,000m2, office 3000m2, 80 workers
  
                 3.What other products do you have?
                  Our company also has Gold Dredger,Weed Harvester,Concentrator,Pulsating Sluice Box,etc

                 4. What equipment do you build?
                 Specialized in alluvial/placer gold/diamond mining equipment

                5. Whats the capacity of the gold/diamond mining equipment
                 from 5TPH to 450TPH

                6. What brand engine/diesel generator do you use?
                 Cummins, Weichai, Yuchai, etc, or as required

Copyright 2024 357th.com All Rights Reserved