PLA Dryer at 20mins Drying, Final Moisture Less Than 50ppm, No Clumping

Guangzhou Ouster Hydraulic Co., Ltd. / 2022-07-04

PLA Dryer at 20mins Drying, Final Moisture Less Than 50ppm, No Clumping

=== Base Info ===

=== Description ===
Drying time 20mins
Drying temperature 110ºC
Final Moisture 50ppm Tested by Sartorius Moisture instrument Chip situation after dried No pellets stick   Infrared Crystal Dryer
 Capacity/Output
(KG/H)
80-100200-300300-500500-700700-1000Drum Diameter*Length
(mm)
600*10001200*10001200*20001400*20001800*2000Heating power Installation
(KW)
12243560110Practical Power Consumption
(KW)
614.4213666
Our Advantage

Minutes instead of hours

 
Drying time 20mins
The energy is instantaneously brought into the core of the product by short-wave infrared radiation.The heat flow pushes the moisture from the inside towards the outside of the product.After the moisture has been released from the material it is directly discharged by the air circulating inside the machine.


 
InstantlyThe production run can start immediately upon startup. A warm-up phase of the machine is not required
No clumping





 
The rotation of the drum ensures constant movement of the material.
Evenly The spiral coils and mixing elements designed for your product ensure an optimal mix of material and avoids clumping. Your product is evenly heated.
Final moisture Can be 50ppm
Easy cleaningGood access to all components allows for easy and fast cleaning. Rapid product change-over.
In one stepCrystallization and drying in one step.
Siemens PLC Control Retention time, radiation level, and many other process parameters are regulated by means of integrated PLC control.
Control.The process data, such as material and exhaust air temperature or fill levels are continuously monitored by means of sensors and pyrometers. Deviations trigger automatic adjustment.
Reproducibility.Recipes and process parameters can be stored in the controlling system to ensure optimal and reproducible results.
Remote maintenance.Online service via modem.

How to Ensure the Quality >>In order to ensure the accuracy of each part, we are equipped with a variety of professional processing equipment and we have accumulated professional processing methods over the past years; 
>>Each component before assembly needs strictly control by inspecting personnel.
>>Each assembly is in charged by a master who has working experience for more than 20 years;
>>After all the equipment are completed, we will connect all the machines and run the full production line to ensure the stable running in customers' factory  


Our Service 
>>
We will provide testing if the customer comes to visit factory to see the machine.
>>
We will provide detail machine technical specification ,electric diagram,installation,operation manual and all the documents which customer needed for clearing customs and using the machine.>>We will provide engineers for helping installation and training the workers at customer's site. >>Spare parts are available when they are needed .Within warranty time,we we will provide spare parts free,and over warranty time,we will provide spare parts with factory price.>>We will provide technical support and repair service in the whole lifetime.
  

Copyright 2024 357th.com All Rights Reserved