a Complete of Gold Carbon Leaching Cil Gold Processing Plant for Sale

Ruian Aobaosi Machinery Co., Ltd. / 2022-07-04

a Complete of Gold Carbon Leaching Cil Gold Processing Plant for Sale

  • Voltage:380V
  • Weight:>10T

=== Base Info ===

  • Model NO.:gold CIL
  • Material:Carbon Steel
  • Material Feature:Oil Resistant
  • Certification:ISO9001:2008
  • Energy Saving:Energy Saving
  • Warranty:1 Year
  • Color:Blue
  • Customized:Customized
  • Condition:New
  • Transport Package:Bulk
  • Specification:As different model
  • Trademark:Hengchang
  • Origin:Jiangxi Province, in China
  • HS Code:8474100000
  • Production Capacity:50sets,Month
  • Package size per unit product:110.00cm * 110.00cm * 110.00cm
  • Gross weight per unit product:110.000kg

=== Description ===

Basic Info.

Model NO. gold CIL Material Carbon Steel Material Feature Oil Resistant Certification ISO9001:2008 Energy Saving Energy Saving Warranty 1 Year Color Blue Customized Customized Condition New Transport Package Bulk Specification As different model Trademark Hengchang Origin Jiangxi Province, in China HS Code 8474100000 Production Capacity 50sets/Month

Packaging & Delivery

Package size per unit product 110.00cm * 110.00cm * 110.00cm Gross weight per unit product 110.000kg

Product Description

a Complete of Gold Carbon Leaching Cil Gold Processing Plant for Sale Introduction of Gold CIL Plant
Gold CIL process (carbon in leach) is an efficient method of extracting and recovering gold from its ore. By cyaniding and carbon leaching crushed gold ore slurry simultaneously, CIL process lowers the gold mining operation cost and increases gold recovery rate to a degree of 99%. It is the first choice of modern gold mining and gold beneficiation plant.
a Complete of Gold Carbon Leaching Cil Gold Processing Plant for Sale


1. After the crushing and grinding stage, add 9 step-arranged high-efficiency cyanidation leaching tanks into the pulp. Gold pulp cyanidation is carried on the first two leaching tanks, countercurrent adsorption operation is carried on the last six or seven leaching tanks (cyanidation and adding activated carbon simultaneously).

a Complete of Gold Carbon Leaching Cil Gold Processing Plant for Sale


2. In the adding activated carbon step, add the coconut shell activated carbon (small hole, high activity, wear-resisting and renewable) specially selected by professional engineers team mineral processing design institute into the pulp, which can dissolve and adsorb the gold and silver ions then form the gold loaded carbon according to the characteristics of gold and silver adsorption.

3. Vibrating screen and dewatering screen are the key equipment for the reverse movement of pulp and carbon. Filter press and high frequency dewatering screen developed by frofessional engineers can effectively reduce the carbon wear on the surface of vibrating screen and in the process of continuous slurry pumping, and reduce the cost, facilitate the maintenance and operation.
a Complete of Gold Carbon Leaching Cil Gold Processing Plant for Sale

4. The desorption electrolysis system implements high-temperature desorption electrolysis on gold in the gold-loaded carbon through the mixed liquor of sodium cyanide and sodium hydroxide. After wood chips and other sundries are removed by washing machine, and the gold desorption is carried out by high-temperature and high-pressure desorption method (150 degrees and 0.5Mpa), which can resolve 99% of gold within 2-6 hours.
a Complete of Gold Carbon Leaching Cil Gold Processing Plant for Sale

a Complete of Gold Carbon Leaching Cil Gold Processing Plant for Sale


Application of Gold CIL Plant:
mainly applies for the process of above 1g/t grade gold ore and gold ore with large bearing ore volume: silver,platinum, copper, etc. As CIL sees a better performance in extracting these minerals at the same time. And Mineral Dressing Test Center can help you with the component testing of your ores.
Jiangxi Hengchang Mining Machinery Manufacturing Co., Ltd. is located in No.3 Chuangye Road. Guzhang In dustrial Park. Shicheng County. Ganzhou City. Jiangxi Province. China.Our company is engaged in the mineral processing equipment research, development, design and production for many years history, has accumulated rich experience in design and production. Enterprise in mineral processing equipment industry has had a positive effect, set up the good reputation. And mainly the manufacture of the products like as Shaking table. Flotation equipment. Crushing equipment. Magnetic separator. Screening equipment. Classifying equipment. Agitation tank, Feeding equipment. Gravity separation equipment. Wet separation equipment. Spiral chute. Saw-tooth wave jig and Diaphragm Jig. Grinding equipment. Ball mill. Slurry pump. Centrifugal pump, Conveying equipment.

We manufacture various types of mineral processing machinery and equipment according to our customers' requirements. Our products are widely used for sorting gold, silver, copper, iron, tungsten,lead. zinc. tin. molybdenum, nickel, tantalum, niobium, manganese ore, coal, monazite, rutile,diamonds, other precious metals and precious metals mine, and for the flotation colored, black metal,precious metals and other minerals. And we have export qualifications, our products sell well all over the world for several years, especially exported to Brazil. India. Indonesia.South Africa. Somalia, Philippines. Malaysia. Sudan, Nigeria. Iran, Russia, Ghana. Kazakhstan Kyrgyzstan.Cambodia,Vietnam,Korea,Mongolia and other countries.

Gold Mining Wash Plant Sand Washing Machine for Sand

Gold Mining Wash Plant Sand Washing Machine for Sand
Gold Mining Wash Plant Sand Washing Machine for Sand

Our service:

1.Pre-sale services:
(1)Select equipment model;
(2) Design and manufactLire products according to clients' special requirement;
(3)Train technical personnel for dients.

2.Services during the sale:
(1) Pre-check and accept products ahead of delivery;
(2)help clients to draft solving plans.

3. After-sale services:
(1) Assist dients to prepare for the first construction scheme;
(2)Install and debug the equipment;
(3) Train the first-line operators on site;


FAQ

Q: Are you trading company or manufacturer ?


A: We are factory.not dealer.Direct factory sale makes price more competitive.


Q: How long is your delivery time?


A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
 

Q: Do you provide samples ? is it free or extra ?


A: Yes, we could offer the sample for free charge but do not pay the cost of freight.


Q: What is your terms of payment ?


A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
 

Copyright 2024 357th.com All Rights Reserved