=== Base Info ===
=== Description ===
Basic Info.
Model NO.
KM-1000A-13000A
Computerized
Computerized
Clamping Force
70T-1000T
Injection Pressure(ps)
360*360mm-1110*1110mm
Space between tie bars
360*360mm-1110*1110mm
Transport Package
Wooden Package
Specification
SGS / ISO / CE Approved
Trademark
KM
Origin
China
HS Code
8422
Production Capacity
10PCS/Month
Product Description
Automatic Plastic Injection Machine For Bottle Cap or HandleDetailed Product Description:Injection moulding machine / Adopting Europe technology, hydraulic unit adopts proportional pressure and flow control, the pressure and the speed can be adjusted, stable movement curve and gentle shock, the computer is imported from Industry family. The LCD displaying screen with high clarity has Chinese and English language to use. Close-loop PID temperature control with the advantage of high precision. The operating table of the injection moulding machine have two safety, one is machine safety, another is electrical safety, that ensures the operators's safety.
Mould /Our mould producing center produces exact mould, adopts the high grade material to make. The perform mould uses the hot runner technology, inside uses the imported steel, the surface's brightness is very high and the service time is very long.
Features:1) LCD computer control with big display screen
2) Hydraulic double proportional valve
3) Hard chrome plated high tensile strength steel tie bars
4) Generous space for fitting large moulds
5) Large opening stroke
6) Two position transducers to control Clamping and Injection
7) Four stages of injecting, independent velocity and pressure control
8) Hydraulic mould height adjustment device
9) Screw cold-start prevention device
10) Melt decompression control
11) Screw back pressure control
12) Multiple hydraulic ejection
13) Differential high speed clamping
14) Centralized lubrication system
15) Low pressure mould protection device
16) Mechanical safety interlock
17) Double electrical safety interlock
18) Oil return filter
19) Oil tank with inner stainless steel container
Specification | Clamping force | Max. Plasticising weight(PS)g | Space between tie bars (mm×mm) |
BST-700 | 70 | 101 | 320×320 |
BST-950A | 95 | 183 | 360×360 |
BST-1300A | 130 | 260 | 420×420 |
BST-1600A | 160 | 486 | 480×480 |
BST-2000A | 200 | 643 | 505×505 |
BST-2400A | 240 | 845 | 555×555 |
BST-3000A | 300 | 1050 | 600×600 |
BST-3800A | 380 | 1286 | 680×680 |
BST-4800A | 480 | 1600 | 760×760 |
BST-5500A | 550 | 2466 | 810×810 |
BST-6500A | 650 | 2895 | 850×850 |
BST-7500A | 750 | 3543 | 950×950 |
BST-10000A | 1000 | 6280 | 1110×1110 |
Machine Photos:Injection mouldPreform samples :Zhangjiagang King Machine Co., Ltd.Is a group company located in Zhangjiagang city, we have more than 15years experiences on beverage machinery and plastic machines.
We devote ourselves to the development, research and production of plastic machine and liquid food and beverage packing and filling industry and automatic blow molding machine in China.
Our Main products including:Mineral water and purified water producing line.Carbonated beverage producing line.3 gallons& 5gallons producing line.Flat and tube UHT device, and CIP system.All the products are sold well in every province and city of the whole country and also exported to about thirty countries and areas with strong technical force, advanced equipment, scientific management system and perfect after-sales service.
Our Main Products Likes:
1000-15000bph water productione line
1000-15000bph juice production complete line
1000-15000bph carbonated drink production line
1000-15000bph wine bottling line
1000-9000cph canning line
1000-6000cph Oil filling line
5gallon bottle filling line
Stand alone machines also available
Welcome Customers Visit Our Company.
King Machine
<1> Standardized workshop of total 21,000 square meters.
Different types of processing units, such as water jet cutter, plasma cutter, laser cutter, CNC machine from Taiwan chevalier & korea daewoo, ensure the precision of parts.
<2>International certification, National Certificate of equipment verification, and more than 30 invention patents are done in King machine .
Verification Certificates of equipments: ISO9001:2001; CE Certificate , SGS , COC , TUV
National Certificate of equipment verification:standard organisation of Nigeria , CNCA certificate, Logo trademark registration, etc.
<3>The equipment will be tested and run for 24 hours before leaving the factory, to ensure the smooth working of water pipeline, and pneumatic, electrical and mechnical stability.
<4>Sufficient stock of spare parts ensures the timely delivery and supply of spare parts.
<5>The engineers are experienced. We can produce different products with different capacity and work out reasonable flow chart as per customers' requirements to save space.
<6>Professional installation team who can speak fluent English can help customers make benefits in a shortest time.
King Machine
1. Installation, debug
After equipment reached the workshop of customer, place the equipment according to plane layout we offered. We will arrange seasoned technician for equipment installation, debug and test production at the same time make the equipment reach the rated producing capacity of the line. The buyer need to supply the round tickets and accommodation of our engineer, and the salary.
2. Training
Our company offer technology training to customer. The content of training is structure and maintenance of equipment, control and operation of equipment. Seasoned technician will guide and establish training outline. After training, the technician of buyer could master the operation and maintenance, could adjust the process and treat different failures.
3. Quality guarantee
We promise that our goods are all new and not used. They're made of suitable material, adopt new design. The quality, specification and function all meet the demand of contract. We promise that the products of this line could storage for one year without adding any aseptic.
4. After sales
After checking, we offer 12 months as quality guarantee, free offer wearing parts and offer other parts at the lowest price. In quality guarantee, the technician of buyers should operate and maintain the equipment according to seller's demand, debug some failures. If you could not solve the problems, we will guide you by phone; if the problems are still can not solve, we will arrange technician to your factory solving the problems. The cost of technician arrangement you could see the cost treatment method of technician.
After quality guarantee, we offer technology support and after sales service. Offer wearing parts and other spare parts at favorable price; after quality guarantee, the technician of buyers should operate and maintain the equipment according to seller's demand, debug some failures. If you could not solve the problems, we will guide you by phone; if the problems are still can not solve, we will arrange technician to your factory solving the problems.
FAQ
Q1: Do you have reference project?
A1: We have reference project in most countries,If we get the permission of the customer who has brought the machines from us ,we can tell you their contact imformation,you can go to vist their factory.
And you are always welcome to come to visit our company,and see the machine running in our factory,we can pick you up from the station near our city.
Contact our sales people you can get video of our reference running machine
Q2: Do you have agent and after-service stations?
A2: So far we have agent in Yemen,Nigeria,Dubai,India,Kenya,Dubai welcome to join us!
Q3: Do you provide customized service
A3: We can design the machines according your requirements(materil ,power,filling type,the kinds of the bottles,and so on),at the same time we will give you our professional suggestion,as you know,we have been in this industry for many years.
Q4: What's your guarantee or the warranty of the quality if we buy your machines?
A4: We offer you high quality machines with 1 year guarantee and supply life-long technical support.
Q5: How long time for installation?
A5: According your machines order,we will send one or two engineers to your plant,it will take about 10 days to 25 days.