PVC/UPVC Plastic Window and Door Frame Profile Extrusion Line

Ningbo Easyget Co., Ltd. / 2022-07-04

PVC/UPVC Plastic Window and Door Frame Profile Extrusion Line

=== Base Info ===

=== Description ===
One setPVC/UPVC Plastic Window and Door Frame Profile Extrusion Line

Special designed PVC Profile co-extrusion machine for making window profile:
this machine can be used for making PVC +ASA window profile, the main material is PVC layer, and surface coated with ASA material for beautiful wooden color design and anti-sunshine. it will not color fad for outside 10-30 years even under sunshine.
PVC/UPVC Plastic Window and Door Frame Profile Extrusion Line

Detailed Images of PVC profile extrusion line with co-extrusion system

Extruder :Conical double screw extruder specially designed for PVC profile
Model: SJMS65/132 model
Main power: 37KW
Capacity: 150-240 kg/h
Max. product width: 300-600mm

PVC/UPVC Plastic Window and Door Frame Profile Extrusion Line
Co-extrusion system: SJ35 co-extruder for ASA material, co-extrusion die head design
Die head and mold for the PVC profile:

Customized size and shape
Mold material: 3Cr17
Cooling method: water cooling and vacuum cooling

PVC/UPVC Plastic Window and Door Frame Profile Extrusion Line

calibrating machine

Length of table:4-12 meter customized

material of table: stainless steel

cooling method: water cooling and vacuum cooling.

vacuum pump: 7.5kw*1 sets,+5.5kw*2 sets

water pump: 2.2kw*1 set
PVC/UPVC Plastic Window and Door Frame Profile Extrusion Line

haul off machine

Haul off type: double caterpillar

length of haul off: 2.4 meter

control of haul off: frequency control

motor : 1.5 kw

gearbox: double gearbox
PVC/UPVC Plastic Window and Door Frame Profile Extrusion Line

 

Cutting machine for WPC door frame machine

cutting method: automatic cutting

cutting control: PID control

Length: fix length cutting

PVC/UPVC Plastic Window and Door Frame Profile Extrusion Line
Product stacker:
Automatic stacking, 6 meter length. made from stainless steel
PVC/UPVC Plastic Window and Door Frame Profile Extrusion Line


Electric control cabinet
ABB inverter
Omron temperature control
Siemens motor
Siemens contractor
Siemens PLC control is optional

PVC/UPVC Plastic Window and Door Frame Profile Extrusion Line


FAQ
1, DO YOU PROVIDE OEM SERVICE?
we accept OEM order to design the machine according to customer's special requirements.

2, HOW CAN I GET THE TECHNICAL PARAMETERS?
Please contact us for sending you detailed quotation with technical parameters

3, WHAT IS THE WARRANTY TERMS?
3.1 WARRANTY PERIOD: 12 MONTHS, STARTING FROM THE FIRST DAY OF RUNNING MACHINES IN CUSTOMER'S WAREHOUSE
3.2 SELLER SHALL GRANT: SERVICES AND SPARE PARTS, FREE-OF-CHARGE SERVICE THROUGHOUT THE ENTIRE EQUIPMENT WARRANTY PERIOD.
3.3 LIFELONG SERVICE: THE SELLER SHOULD PROVIDE LIFELONG SERVICE FOR THE SOLD GOODS, THE BUYER PAY FOR NEEDED SPARE PARTS AFTER THE 12MONTHS WARRANTY TERMS.

4, WHAT IS THE DELIVERY CONDITIONS?
4.1 DELIVERY CONDITION: FOB QINGDAO PORT.
4.2 DELIVERY TERM: WITHIN 45 WORKING DAYS AFTER RECEIPT OF ADVANCED PAYMENT, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION. THE SELLER SHOULD FINISH PACKING OF GOODS AND READY FOR SHIPMENT WITHIN 15 WORKING DAYS AFTER THE SELLER RECEIPT THE FULL PAYMENT.
4.3 SUPERVISION OF LOADING:THE SELLER SHOULD INFORM THE BUYER EXACTLING LOADING TIME, THE BUYER SHOULD ARRANGE FOR SUPERVISION OF LOADING.

5, WHAT IS THE PAYMENT TERMS?
5.1 INSTALLMENT I: 30% OF TOTAL PAYMENT TO BE PAID AT ADVANCE
5.2 INSTALLMENT II: THE BALANCE 70% OF TOTAL PAYMENT TO BE PAID BY TT OR LC AT SIGHT

6, HOW TO DO THE INSPECTION WORK BEFORE SHIPMENT?
WHEN THE MACHINE FINISHED, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION BEFORE SHIPMENT, THE SELLER GUARANTY GOOD PERFORMANCE OF ALL THE SOLD GOODS.THE SELLER UNDERTAKE THE MATERIAL COST FOR THE MACHINE INSPECTION IN SELLER'S FACTORY. THE BUYER SHOULD COME TO SELLER'S FACTORY TO DO THE INSPECTION WORK, OR THE BUYER COULD ENTRUST ANY THIRD PARTT TO COME TO SELLER'S FACTORY TO DO THE INSPECTION WORK.

7, HOW TO DO THE INSTALLATION AND EQUIPMENT COMMISSIONING?
IF THE BUYER REQUIRES, THE SELLER SHOULD SEND TECHNICIAN TEAM TO BUYER'S FACTORY FOR INSTALLATION AND TESTING THE WHOLE LINE, AND THE BUYER SHOULD UNDERTAKE THE WHOLE FOOD/PLACE AND ROUND TICKETS (AIRPLANE, FOOD, HOTEL, AND SO ON), AND PAY SALARY TO ENGINEER FOR 80 USD/DAY/ENGINEER.

Copyright 2024 357th.com All Rights Reserved