KQG35A High Pressure Drilling Tools DTH Hammer
Zhejiang Feida Machinery Co., Ltd. / 2022-06-23
=== Base Info ===
=== Description ===
Low Pressure Down The Hole Impact/Impactor Hammer | |
Model | Weigth | Fullength | Outer dia. | Working pressure | Impact frequency | Air consumption (m3/min) | Bore Hole Dia. | |
KG | mm | mm | Mpa | Hz | <0.5Mpa | <0.7Mpa | mm | |
QCZJ70A | 12.5 | 763 | 66 | 0.5~0.7 | >14 | 3 | 5 | 70-76 | |
QCZJ90 | 20 | 795 | 80 | 0.5~0.7 | >14 | 5.5 | 8 | 90-100 | |
QCZ100 | 30 | 792 | 95 | 0.5~0.7 | >14 | 9.5 | 11 | 105-120 | |
QC110 | 32 | 835 | 95 | 0.5~0.7 | >14 | 9.5 | 11 | 110-150 | |
Middle Pressure Down The Hole Impact/Impactor Hammer |
Model | Weigth | Fullength | Outer dia. | Working pressure | Impact frequency | Air consumption (m3/min) | Bore Hole Dia. |
KG | mm | mm | Mpa | Hz | <0.5Mpa | <1.0Mpa | <1.2Mpa | mm |
QCK90 | 21.5 | 806 | 80 | 0.5~1.2 | >15 | 5 | 8 | 10 | 70-76 |
QCW930 | 22 | 869 | 80 | 0.5~1.2 | >14 | 5 | 8 | 10 | 90-100 |
High Pressure Down The Hole Impact/Impactor Hammer |
Model | Weigth | Fullength | Outer dia. | Working pressure | Impact frequency | Air consumption (m3/min) | Bore Hole Dia. |
KG | mm | mm | Mpa | Hz | <1.0Mpa | <1.8Mpa | <2.4Mpa | mm |
KQG35A | 23 | 890 | 82 | 1.0~1.8 | >16 | 3.8 | 8.5 | N/A | 90-105 |
KQG45A | 38 | 986 | 99 | 1.0~2.5 | >16 | 6 | 10 | 15 | 105-130 |
KQG55A | 69 | 1110 | 125 | 1.0~2.5 | >16 | 7 | 14 | 19 | 135-155 |
The spare parts photos for DTH impact hammer:

The package:
The other similar items you may need:
About Kaishan Group:
FQA collection:1.Q: Are you a factory or trading company?
A: We has our own factory to produce goods for you.
2.Q: Where is your factory located? How can I visit there?
A: Our factory is located in Quzhou City,Zhejiang Province China. You can fly to Hangzhou Airport directly.All our clients,from home or abroad,are warmly welcome to visit us.
3.Q: About samples
A: We are honored to offer you samples for your checking.Postage can be refund after order is confirmed.
4.Q:Package and Shipping
A: Export packing or as your requirements. Shipment:
5. Q: Payment
A:T/T:30% as deposit and 70% balance after get copy of B/L.
B:L/C
C:Western Union
D:Paypal
E:Discuss together between buyer and supplier.