=== Base Info ===
=== Description ===
315-630mm
Feature of Tongsan PE pipe making machine:
1,The main machine adopts screws specially used for polyolefin. Equipped with auto vacuum charger and auto constant temperature dryer hopper, it possesses features of high production, good plasticization and stable extruding.
2,Die heads of helical type and basket type are perfect for polyolefin, and can help to produce sound melting pressure, and improve the plasticization capacity. Meanwhile, stable material-flow and pressure grade can be guaranteed.
3, Advanced vacuum calibrating method improves the cleanliness and hardness of surface. Reasonable high-speed sprinkling cooling water tank guarantees the pipe quality and high speed stable extruding.
4,Caterpiller of the hauling machine adopts anti abrassion alloy material, which realizes stable traction, wide frequency adjustment range and long lifespan.
5,New generation auto dust-free cutting blade realizes smooth cutting secant, high precison and low noise.
Detailed Imagesthe complete extrusion line for making PE pipe, including auto feeder, extruder, die and mold, cooling tank, haul off machine, cutting machine, stacker 1, High effective single screw extruder with PLC control system.it equipped with auto feeding and auto drying system.
the co-extruder can make the marking line on the pipe.
we will design the co-extruder according to the pipe marking line requirements.2, Professional designed Die head and mold.designed for 1-4 marking lines for Water supplying PE pipe production
3, fast cooling water spraying tank and vacuum cooling tank:
for different size of PE pipe making, the quantity and capacity of water and vacuum tank may also different.4, Strong force haul off machine for stably production,
according to the PE pipe size, we shall equip double caterpillar haul off, three caterpillar haul off, four caterpillar haul off, six caterpillar haul off.
5, and automatic cutting machine without dust:
the cutter is equipped with PLC touch screen system,
the user can set the cutting length and it shall cut automatically.6, PE pipe automatic stacking device, and high quality PE water pipe made by our machine.
the stacking device is 6 meter length, it shall stack the PE pipes together automatically.7, Electricity control system.We equip high quality electric control system for PE pipe extrusion line,Electric applicant: 380V/50HZ/3 PHASES or customized |
1). ABB inverter 2). Siemens contactor 3). Omron temperature controller 4). Siemens motor 5). Taiyuan Yuanli Pump 6). Guomao brand vertical gearbox 7). cables:equipped cables for connection the machines to the electricity cabinet. The complete extrusion line electricity needs shall all connected to this cabinet. 8). heat ventilation of cabinet is designed with blowing fans:6 sets 9). Siemens PLC control system is optional |
FAQ
1, DO YOU PROVIDE OEM SERVICE?
we accept OEM order to design the machine according to customer's special requirements.
2, HOW CAN I GET THE TECHNICAL PARAMETERS?
Please contact us for sending you detailed quotation with technical parameters
3, WHAT IS THE WARRANTY TERMS?
3.1 WARRANTY PERIOD: 12 MONTHS, STARTING FROM THE FIRST DAY OF RUNNING MACHINES IN CUSTOMER'S WAREHOUSE
3.2 SELLER SHALL GRANT: SERVICES AND SPARE PARTS, FREE-OF-CHARGE SERVICE THROUGHOUT THE ENTIRE EQUIPMENT WARRANTY PERIOD.
3.3 LIFELONG SERVICE: THE SELLER SHOULD PROVIDE LIFELONG SERVICE FOR THE SOLD GOODS, THE BUYER PAY FOR NEEDED SPARE PARTS AFTER THE 12MONTHS WARRANTY TERMS.
4, WHAT IS THE DELIVERY CONDITIONS?
4.1 DELIVERY CONDITION: FOB QINGDAO PORT.
4.2 DELIVERY TERM: WITHIN 45 WORKING DAYS AFTER RECEIPT OF ADVANCED PAYMENT, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION. THE SELLER SHOULD FINISH PACKING OF GOODS AND READY FOR SHIPMENT WITHIN 15 WORKING DAYS AFTER THE SELLER RECEIPT THE FULL PAYMENT.
4.3 SUPERVISION OF LOADING:THE SELLER SHOULD INFORM THE BUYER EXACTLING LOADING TIME, THE BUYER SHOULD ARRANGE FOR SUPERVISION OF LOADING.
5, WHAT IS THE PAYMENT TERMS?
5.1 INSTALLMENT I: 30% OF TOTAL PAYMENT TO BE PAID AT ADVANCE
5.2 INSTALLMENT II: THE BALANCE 70% OF TOTAL PAYMENT TO BE PAID BY TT OR LC AT SIGHT
6, HOW TO DO THE INSPECTION WORK BEFORE SHIPMENT?
WHEN THE MACHINE FINISHED, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION BEFORE SHIPMENT, THE SELLER GUARANTY GOOD PERFORMANCE OF ALL THE SOLD GOODS.THE SELLER UNDERTAKE THE MATERIAL COST FOR THE MACHINE INSPECTION IN SELLER'S FACTORY. THE BUYER SHOULD COME TO SELLER'S FACTORY TO DO THE INSPECTION WORK, OR THE BUYER COULD ENTRUST ANY THIRD PARTT TO COME TO SELLER'S FACTORY TO DO THE INSPECTION WORK.
7, HOW TO DO THE INSTALLATION AND EQUIPMENT COMMISSIONING?
IF THE BUYER REQUIRES, THE SELLER SHOULD SEND TECHNICIAN TEAM TO BUYER'S FACTORY FOR INSTALLATION AND TESTING THE WHOLE LINE, AND THE BUYER SHOULD UNDERTAKE THE WHOLE FOOD/PLACE AND ROUND TICKETS (AIRPLANE, FOOD, HOTEL, AND SO ON), AND PAY SALARY TO ENGINEER FOR 80 USD/DAY/ENGINEER.
PS: Above Items are discussable according to customer's special requirements.