Ce Certification High Quality Hamburger Meat Forming Machine

AIRMAX AL CO., LIMITED / 2022-07-05

Ce Certification High Quality Hamburger Meat Forming Machine

  • Certification:CE, ISO9001
  • Power Source:Electric
  • Process:Mild Processing
  • Automatic Grade:Automatic
  • Application:Hamburger Meat Forming Machine
  • Customized:Customized

=== Base Info ===

  • Model NO.:400
  • Type:Forming Machine
  • Color:Silver
  • Warranty:One Year
  • Function:Hamburger Meat Forming Machine
  • Raw Material:Steak, Meat, Potato, etc.
  • Material:Stainless Steel
  • Motor Brand:ABB,Siemens Optional
  • Main Motor Power:15.12kw
  • Weight:1500kg
  • Voltage:380V,50Hz
  • After-Sales Service Provided:Field Installation, Commissioning and Training
  • Screw Diamater:65mm, 70mm, 85mm, 95mm
  • Condition:New
  • Transport Package:Wooden Case
  • Specification:20000*3000*2600mm
  • Trademark:KS
  • Origin:Shandong, China
  • HS Code:8438800000
  • Production Capacity:20set,Month

=== Description ===

Model 

NHJ400-II

NHJ600-II

Speed of the cutter-axes 

119~59r/min  adjustable 

Space between the cutter-axes

-5~30mm adjustable 

The diameter 

130mm

Power of the motor 

1.1Kw

Overall dimension

1685x650x1304mm

1685x850x1304mm

 

Ce Certification High Quality Hamburger Meat Forming Machine
 

 

 

2.Packaging and shipping:

Every machine is packed with great care and tough material. It is packed with cling films first and then film bags. At last, it is packed with wooden case which is reinforced with the iron bar on the top and bottom.With this kind machine, all our laser machine can protect well during long trip by sea or by train.We can transport machine by boat or by training, according to your requirement.

Ce Certification High Quality Hamburger Meat Forming Machine


3.Competitive Advantages:
1. Guaranty: One Year.
2. One set of consumable accessories will be provided with the machine.
3. Any question, you can mail/call us at any time. And our most experienced engineers are assigned to give consulting service, and always available for dispatching abroad.
4. All spare parts are always available for delivery.
5. Manual is in English.
6. Minimum order: 1 set
7. Prompt Delivery: 15-20 working days after receiving deposit
8. Installation: sending one technician to the customer's factory for installation and training.
9. Packaging: firstly packing with plastic inner side, then strengthening with wooden case outside.

4.Company Information:
 
Keysong was founded in 2013. Specializing in producing food machines for more than 6 years. Since its inception, it is specializing in the manufacture, research, development, sales and after-sales of food extrusion machine, puffed food production line, fruit and vegetable washing and drying processing line.

Our History:
In 2013, Keysong was established, concentrating on manufacturing and selling extrusion snack production line at home and abroad. 
In 2014, Keysong broke traditional breakfast cereal production technology, and invented new production process.
 In 2015, Keysong moved to a new workshop, which covers the area of 5000 square meters. In 2015, we have our agency in India, Nigeria, Thailand, Morocco and Algeria.
In 2016, Keysong cooperated with Shandong Liwei Microwave equipment, started researching on food microwave drying technology. In August, 2016, Keysong build a team, concentrating on researching on the technology of vegetables and fruits washing, cutting, drying and freezing. And has received great results till now.

Ce Certification High Quality Hamburger Meat Forming Machine

Ce Certification High Quality Hamburger Meat Forming Machine

Ce Certification High Quality Hamburger Meat Forming Machine
Ce Certification High Quality Hamburger Meat Forming Machine
 

 

 

 

 

 

About us & more details:

MOQ

1 set

Supply Ability

20 sets per Month

Shipping port

Qingdao port, Shandong, China

Packing details

Fumigation-free wooden case outside, stretch film inner

Relevant spare parts

free, delivery with processing line

Guarantee

Within 12 months

Oversea service

Provide installation and commissioning after machine arrived your factory

Payment terms

30% is paid by T/T as the down payment, 70% is paid by T/T or L/C before shipment.

Delivery time

30 days after receipt the deposit

Pre-shipment

When it finished, we will invite you to our company to inspect machines, when no problem, we will arrange the shipment

FAQ:
1. How about the documents after shipment?
After shipment, we'll send all original documents to you by DHL/TNT, including Packing List, Commercial Invoice, B/L, and other certificates as required by clients.
2. How long is the delivery time?
For standard machines, it would be20-30 days; For non-standard machines and customized machines according to client's specific requirements, it would be 30-45 days.
3. Do You Arrange Shipment For The Machines?
Yes, dear esteemed customers, for FOB or CIF price, we will arrange shipment for you. For EXW price, clients need to arrange shipment by themselves or their agents.
4. How is the packing?
Water-proof plastic film package with foam protection in each corner Solid Seaworthy Wood Box Package with Steel Belt Save space as much as possible for container loading 





Please feel free to contact us: 
Jinan Keysong Machinery Co., Ltd. 
Holly Huo
Tel : +86-155 5006 3605
keysong.en.made-in-china.com


 

Copyright 2024 357th.com All Rights Reserved