Ningbo Conwhole Hardware Co., Ltd. / 2022-07-04
=== Base Info ===
=== Description ===
1.PRODUCTION INTRODUCTION
The PVC/WPC door and window profile production line can choose different specifications of conical twin-screw extruders according to different profile sections and molds, and configure the corresponding vacuum calibration table, tractor, cutting machine, stacker and other auxiliary equipment.
2.Technical Parameter
Model | TPM-180 | TPM-300 | TPM-600 |
Max.width of product(mm) | 180 | 300 | 600 |
Extruder model | SJSZ-51/105 | SJSZ-65/132 | SJSZ-80/156 |
Extrusion capacity(kg/h) | 180 | 250 | 350 |
Motor power(kw) | 22 | 37 | 55 |
Total length(m) | 18 | 22 | 26 |
Item | Quantity |
SJSZ- 65 Twin Screw Extruder with Automatic Feeding System | One set |
Die Mold & Stock Mold | One set |
Vacuum Calibrarion Table | One set |
Haul-off and Cutter Unit | One set |
Stacker | One set |
Electric Control System | One set |
Feeder | • To feed material into extruder; |
Extruder | •World famous brand electrical component: Siemens, Schneider, ABB etc; • High torque gearbox with adopts NSK/SKF bearing; • Siemens motor achieved global after service; • Bimetallic screw and barrel; • Intelligent PLC controlling system with human-friendly interface. |
Die head | • 3Cr13/3Cr17 material • Complete set include extrusion die head, calibrator and cooling tank |
Calibration table | • Include full set of vacuum and water pump • Width: 240mm • Length: 6000mm • Independent operation panel for easy operation |
Haul off | • Upper/lower caterpillar driven separately and speed control by inverter • Fast change type pads for easy operation |
Cutter | • Lifting saw cutter with adopts double station dust collection system •Synchronous driving by air cylinder or servo motor control |
Stacker | • Stainless steel304 as touching material • Discharge driving by air cylinder |
Technical documentation |
All symbols on the equipment will be in English. We will be responsible for providing the Buyer with a general layout plan, electrical plan, installation orientation and manuals, in English. |
Arrangements for inspection, installation and testing of the equipment |
a. After all of the equipment is delivered to the customer's factory, the Buyer shall be responsible for all preparation work, e.g. electricity supply, water supply, cranes and labor, etc. b. We will prepare visa applications for their engineers, who will assist in the equipment installation and testing at the Buyer's factory. c. The Buyer will buy a round-trip air ticket for the engineer(s) after the visa application is approved. The Buyer is responsible for all expenses generated, e.g. visa application fees, meals, accommodation and an allowance of $80.00 per day for each engineer. d. The engineer(s) will provide free training for the operators and maintenance people, in Buyer's factory. e. If the Buyer does not request commissioning by our engineer(s) within four months from the date of the bill of lading, it will be accepted that all the equipment has been successfully tested and approved by the Buyer. |
Quantity and quality guarantee |
a. In cases of quantity discrepancies or equipment damage, at the destination, the Buyer will file a claim within 30 days after the arrival of the goods at its destination. The insurance company and the shipping company will be responsible for all discrepancies and damage caused by the shipping company or other transportation companies. b. Guarantee period and after-sales services: 13 months from the date of the bill of lading. During this guarantee period, if there is a quality issue, we will provide spare parts without charge. If malfunctions are caused by the Buyer's improper operation of equipment, we will provide the Buyer with spare parts at cost prices. c. Long-term service: Beyond one year, we will provide the Buyer with spare parts at reasonable prices and provide long-term technical guidance. |