1000L Large Tanks Blow Molding Machine

Guangdong Tangong Machinery Industry Co., Ltd. / 2022-07-04

1000L Large Tanks Blow Molding Machine

=== Base Info ===

=== Description ===

PARISION CONTROL THINCKNESS CONTROLMOOGJAPANPLCSEIMENSGERMANYTEMPERATURE CONTROL MODULESEIMENSGERMANYSERVO VALVE & SERVO TRANSDUCERMIRANITALYINVERTERSEIMENSGERMANYHYDRAULIC OIL SEALDZTAIWANINTERMEDIATE RELAYOMRONJAPANPNEUMATIC VALVEAIRTECHTAIWANHYDRAULIC PUMP & VALVEYUKENJAPANPNEUMATIC SWITCH & CONTACTORSEIMENSGERMANYHYDRAULIC MOTOR & SCREW MOTORSEIMENSGERMANYREDUCERGUOMAOCHINA
6.SpecificationNo specifications1000 Liter  Model No.1 layer  Processing materialHDPE/HMWHDPE1ExtrudersGear Box TypeHard surfaceMax Screw Speed60RPM2Accumulator Die HeadHeating Load45kwDie-Core size [Max]∮500MMInverterSiemensMax. parison weight33KG3Moulding Clamping UnitCLAMPING PLATEN Size1600X1500mmMAX MOLD SIZE1400X1600mmMould Clamping Force800KNMould Thickness950-1350mm4Stretching and Blowing UnitSpreading stroke400-800mmVertical stroke max.300mm5Electrical Control PanelThickness controller100 points MoogMain Operation PanelSiemensDie Head Control Temperature ControlSiemens6Hydraulic SystemHydraulic Drive motor (Main)45KWHydraulic Drive Motor (Parison Control)7.5kwOil Tank Capacity1000L7Gripper Gripped stroke350mm8Hopper LoaderLoader800kg/H 1pcsHopper50kg 1pcs9Production rate
Of 1000 ltr.Productivity12pcs/hProduct Weight18kg10Delivery period 4 months11Weight of Machine 28Ton Size of Machine[L x W x H ]  (M)11mx4.5mx6.2m12Total power 260KW13Average power Consumption 85KW1000L Large Tanks Blow Molding Machine
1000L Large Tanks Blow Molding Machine
1000L Large Tanks Blow Molding Machine
1000L Large Tanks Blow Molding Machine
1000L Large Tanks Blow Molding Machine

DELIVERY TIME  
4 months after the down payment;
TRAINNING
The Buyer could dispatch their operators to the Seller's factory for training, including machine operation, maintenance & simple repairs;
Or against the requests of the Buyer, the Seller's technician could train the Buyer's operators in the Buyer's factory in the periods of installing & adjusting; 
INSTALLATION & ADJUSTMENT
The Seller could dispatch an engineer against the requests of the Buyer to install and adjust the machines for one week(free of charge) in the Buyer's factory. After one week,if the Buyer still needs the training,$100 should be paid for the engineer.
The Buyer should make a reservation in advance before delivery of the machines;
The Buyer should pay for the engineer's food & board while installation in buyer's factory.And the Buyer should also pay for the air ticket for the engineer.
GUARANTEE 
The guarantee time is one year after the machines normally works in the Buyer's factory, if only the problem is cause due to quality control or any reason by the Seller. We will supply replaced parts free of charge and our engineers will guide you how to solve the problems.
Any problem caused due to irregular operation or incorrect maintenance by the Buyer won't be listed in guarantee coverage.

Copyright 2024 357th.com All Rights Reserved