Electrical Wire Conduit Single Wall Corrugated Pipe Production Line

HUAIAN ZHONGYUAN FLUID TECHNOLOGY CO., LTD. / 2022-07-04

Electrical Wire Conduit Single Wall Corrugated Pipe Production Line

=== Base Info ===

=== Description ===

Basic Info.

Condition New Corrugation Pipe Line Automatic Corrugated Pipe Line 20m/Min Transport Package Wood Specification sgs Trademark middle tech Origin Zhangjiagang City HS Code 84772090 Production Capacity 40kg/H

Product Description

Product Description

Description of PE/PP/PVC Single Wall Corrugated Pipe Manufacturing Equipment:

It consists of automatic feeding system/single screw extruder/die head/forming machine /winder.

It is mainly produce PE/PP/PVC single corrugated pipe. The PE/PP/PVC single corrugated pipe is mainly used in the golf course, playgrounds as light load of drainage, floods; Interior decoration cable casing; Automotive wire casing;
Electrical Wire Conduit Single Wall Corrugated Pipe Production Line


Machine's Features: 
Plastic single-wall corrugated pipe production line developed by our company adopts gears to run moulds and templates so as to realize water circulating cooling and air cooling of the products, which ensures high-speed molding, even corrugation, smooth inner and outer pipe wall. 
-----Production speed is 15m/min to 25m/min.
-----The forming machine has 38 pairs to 72 pairs forming block.

Electrical Wire Conduit Single Wall Corrugated Pipe Production Line

Machine parts list:
1. Single screw extruder: SJ-45/30, 65/30
2. Corruated pipe mold: 50-72pairs
3. Corrugated pipe forming machine
4. Double station winder
5. Electric control cabinet.
Electrical Wire Conduit Single Wall Corrugated Pipe Production Line


Technology and Service:
  1. Seller supply full set of technical document, cutter and other full document (write in English) for the extrusion machine.
  2. Seller supply training for buyer's staff until buyer can produce the eligible production independently.
  3. Seller is responsible for installing, testing, adjusting and debugging the machines in buyer's factory.
  4. Buyer should pay the expense for our engineers including for our engineer including round- way tickets, inland traffic, lodging and boarding fee when the machine is installed, tested and maintained.   
  5. Seller will go to install machines after the machine is arrived at buyer and buyer will have prepared all conditions (including power, water, compress air, tools and materials for producing pipe, etc) for installing and testing these machines. Buyer should pay 60USD/day.
  6. When installing, people of both sides cooperate well and carefully, buyer supplies convenient working condition, any problem, should discuss peacefully and kindly.
  7. Buyer supply proper working tools, equipments and other conditions.
  8. The expense including the accommodation and materials of the trial-run the machine for testing and other expenses(electric, water, air and worker) will be on seller's account,  if the buyer or their representatives do the inspection of the machines before shipment.
  9. Guarantee period: 14 months after shipment (the date of B/L)

Electrical Wire Conduit Single Wall Corrugated Pipe Production Line


If you do need any support, please contact us.

Copyright 2024 357th.com All Rights Reserved